Installation Instructions
MSP-WRTIDSKY1 Skybox Kit
3
ASSEMBLY PROCEDURES
WARNING: Improper installation can cause serious per-
sonal injury! Make sure that the structural members can
support a redundant weight factor
five times
the total
weight of the equipment you intend to support overhead.
The structure must be reinforced before you install the Kit
if the structure cannot support a redundant weight factor
five times
the total weight of the equipment.
NOTE:
Items in parentheses () refer to parts shown in
“PARTS” on page 6.
1. Assemble the span brackets (10) using three 1/4-20 X 5/8” car-
riage bolts (30) , three 1/4” flat washers (40), three 1/4” split
lock washers (60) and three 1/4-20 hex nuts (50). Do not
tighten at this time (see Figure 1).
2. Remove the tiles from the area where mounting the kit.
3. Install the span bracket assembly between the suspended ceil-
ing tile rails (grid) and expand the span bracket assembly until
the brackets are flush with the rails (see Figure 2).
4. Tighten three 1/4-20 hex nuts (50) to secure span bracket
assembly between the suspended ceiling tile rails (grid).
5. Hook turnbuckles (120) into the span bracket assembly (see
Figure 3).
6. Install anchoring wire (90) as necessary (see“ANCHORING
PROCEDURES” on page 4).
7. Install two LCD mount brackets (20) using eight 10-32 X 3/8”
button-head cap screws (70) (see Figure 4).
Figure 2. Span Bracket to Grid
Figure 1. Assemble Span Brackets
Figure 3. Hook Turnbuckles to Span bracket
Figure 4. Install LCD Mount Brackets