K1W/K1S Series
Installation Instructions
16
Cable Management
1.
Press insides of cable management covers at both ends to
unhinge tabs on either end of cable management cover on
upper arm. (See Figure 21)
2.
Lift cable management cover up until tabs are unhinged and
cover is in the “open” position. (See Figure 21) and (See
Figure 22)
Figure 21
Figure 22
3.
Route cables through cable management channels. (See
Figure 22)
IMPORTANT ! :
Be sure to leave enough slack in the
cables near display and arm joint to allow for full arm
articulation!
4.
Close cable management covers on monitor arm. (See
Figure 22)
5.
Repeat Steps 1-4 for lower arm.
Array Models
1.
Install array cable clips (J7) to back of array. (See Figure 23)
2.
Route cables through array cable clips (J7) as desired. (See
Figure 23)
3.
Route cables through arm cable clips as desired. (See
Figure 23)
Figure 23
cable management cover tabs
1
2
2
2
4
4
3
3
cable (typical)
(J7)
2
1
3
Содержание K1S120
Страница 17: ...Installation Instructions K1W K1S Series 17...
Страница 18: ...K1W K1S Series Installation Instructions 18...
Страница 19: ...Installation Instructions K1W K1S Series 19...