Intermediate Bracing
The eave tower system must be supported by bracing at the bin eave. This bracing will provide
lateral stabilization. The bracing must be field fabricated and installed by the builder.
There are several basic methods for connecting the eave tower system to the bin. The
recommended method is shown below for reference.
Important Note
: Verify the position of the eave tower system before fully welding the bracing
using 3/16” (.47cm) fillet welds.
1.
Fabricate bracing using 3” x 3” x 1/2” (7.62cm x 7.62cm x 1.27cm) angle iron. This
bracing will be installed on the vertical W stiffener column on the bin wall.
2.
Fabricate bracing using 2” x 2” x 1/4” (5.08cm x 5.08cm x .63cm) angle iron. This
bracing will be installed from the eave tower to the W stiffener. Match drill as required.