![Chiappa Arredamenti 120765 SLB RD Скачать руководство пользователя страница 46](http://html1.mh-extra.com/html/chiappa-arredamenti/120765-slb-rd/120765-slb-rd_instructions-for-use-manual_2597879046.webp)
Actions to be done by carer
Daily
Weekly
Check operation of side rails
Check patient handset and cable
Check ACP and cable
Visually check castors
Visually check power supply cord and mains plug
Check the mattress for damage and fluid ingress
Examine the lifing pole, strap and handle
Check for correct fitting of the locking pin on removable
side rails and extendable head/foot boards.
Actions to be done by qualified personnel
Yearly
Carry out a full test of all electrical bed positioning functions (backrest,
height, tilt, etc.)
Check that the bedstripper / linen shelf remains in its closed position
when maximum foot down tilt is applied.
Check that the bed operates correctly using the backup battery as described
in the next section
Battery test.
Check operation the of castors, paying special attention to braking and
steering functions
Check that the bed extension locks securely
Examine the power supply cord and mains plug – if damaged, replace the
complete assembly; do not use a rewireable plug
Examine all accessible flexible cables for damage and deterioration
Check all accessible nuts, bolts and other fasteners are present and
correctly tightened
Check any accessories fitted to the bed, paying particular attention to
fasteners and moving parts
IFU-120765-SLB-RD-Chiappa-Arredamenti-11/2017#ed04
46