![Check Point S-10 Скачать руководство пользователя страница 18](http://html.mh-extra.com/html/check-point/s-10/s-10_getting-started-manual_2594919018.webp)
Page 18
Chapter 2
Configuring Smart-1
The basic workflow for configuring Smart-1 is:
1. Connect the cables and power on.
2. Perform the initial configuration using the First Time Configuration Wizard.
3. Install the SmartConsole GUI clients.
In This Chapter
Connecting the Power Cables and Power On
Using the First Time Configuration Wizard
Installing the SmartConsole GUI Clients
Connecting the Power Cables and Power
On
1. Connect the power cable(s).
2. Turn on the Power button to start the appliance.
Note
- When a power supply fails or is not connected to the outlet, an
alarm sounds continuously. If you hear the alarm, check that all power
supplies are connected to the outlets. If needed, replace the faulty power
supply immediately, and connect the new unit to the A/C outlet. See
"Removing the Power Supply (on page
)".
Using the First Time Configuration Wizard
Perform the initial configuration of Smart-1 using the First Time Configuration Wizard.
At any time, you can click
Quit
to exit the wizard. Click
Next
to move to the next page.
Note
- When running the First Time Configuration Wizard, you may
not see all the pages shown in this section of the guide, and they may
not appear in the order shown. The pages that appear in the wizard
and their order depend on the Smart-1 software image and on the
selections that you make.