13
Test circuit
Figure 4.5: Measurement of continuity 4-wire
Figure 4.6: Measurement of Continuity P/S - PE
Continuity measurement procedure
Select the
Continuity
function.
Set test parameters / limits.
Connect test leads to C1, P1, P2 and C2 terminals on the instrument (4 wire), or connect test lead to P/S terminal
(2 wire measurement P/S – PE).
Compensate test leads resistance (optional).
Connect test leads to device under test.
Start measurement.
Measurement can be stopped manually or by timer.
Save results (optional).
Figure 4.7: Examples of Continuity measurement results
Содержание C.A 6165
Страница 1: ...C A 6165 Appliance multitester GB Quick start guide ...
Страница 6: ...6 20 USB connector 21 MicroSD card slot ...
Страница 38: ...38 Figure 4 56 Examples of Functional Inspection results ...
Страница 40: ...695739A02 Ed 1 03 2018 ...