®
INSTALLATION INSTRUCTIONS
4. SECURE THE CASING TO THE HEARTH
Secure the stove by inserting screws through the holes in the base (see
diagram).
5. MAKE GOOD THE OPENINGS AND FILL WITH INSULATION
Make good the opening at the top and sides of the convection casing
ensuring that a good seal is made with the side flanges. It is
recommended to use heat resistant plaster on the wall surrounding the
stove.
Follow the liner manufacture’s recommendations regarding insulating
the liner.
If for any reason it is not going to be possible to sweep the chimney
through the appliance, a soot door must be fitted.
6. SLIDE IN STOVE
Carefully slide the stove into the convection casing until the
flue outlet lines up with the flue collar and the air inlet
engages at the rear of the stove.
15
A
B
7. INSERT COACH BOLTS
From the inside of the stove, insert coach bolts into
slots A and B so that they hang down into the stove.
These are held in place by the clips and will secure the
flue collar.
A
B
Содержание C-Four Insert
Страница 1: ...Operating Installation Instructions charnwood Insert ...
Страница 2: ......
Страница 20: ......