![Charlton & Jenrick INFINITY 800HD BF UBL Скачать руководство пользователя страница 24](http://html.mh-extra.com/html/charlton-and-jenrick/infinity-800hd-bf-ubl/infinity-800hd-bf-ubl_instruction-for-user-installation-and-servicing_2591699024.webp)
24
LT 8381 (ISS 01)
800 HD B.F. with UBL INSTALLATION INSTRUCTION
Using 150mm core drill cut a hole following the pilot holes. Drill from the outside through to the cavity to give a good
finish on the outside.
•
Remove any cavity insulation from the cut out opening and for a further 100mm into the cavity gap each
side and above.
•
Pack “Rockwool” around the
sides and top of the opening into the cavity for a depth of 100mm. Also put
some behind the firebox if space is available.
•
Offer the appliance into the opening and mark through the gas pipe entry hole (see connecting the gas
supply section).
•
Pass a tape measure through the core-drilled hole and record the distance from the back of the fire to the
outside wall
•
Cut the outer tube to the recorded length. Add 25mm to this measurement to determine the length of the
inner tube and cut to size.
NOTE: The inner tube will be 25mm longer than the outer tube
•
Remove the appliance from the opening, and position the gas supply (see connecting the gas supply later in
this manual), taking account of the relative gas regulations regarding a gas pipe in a cavity (sleeving and
sealing etc). Note the gas feed must be fitted with the isolation valve supplied.
•
Push the appliance back into the opening and fill any space behind the appliance with “Rockwool”.
•
Complete the gas connection (see connecting the gas supply later in this manual).
•
Drill the four fixing holes through the hole in the flange of the appliance and fix back using plug and screws.
•
If the flue outlet is fitted below 2m from the floor or a balcony then the flue terminal guard must be fitted.
Packaging Check List
1 x Glass Panel
1 x Boxed Fuel Bed
1 x Transformer Plug
1 x Battery Holder
1 x Emergency Power Battery Adaptor
1 x RF Handset
4 x AAA 1.5V Batteries
MARKING OUT WALL FOR
CAVITY RECESSED
INSTALLATIONS
FLOOR SURFACE
CENTRE LINE OF
INSTALLATION
HEARTH SURFACE LINE
OR BASE LINE FOR
HOLE IN WALL (150mm min. from floor)
MARK POSITION
OF LINTEL
605.00
490.00
861
FLUE
CENTRE
1030
LINTEL
HEIGHT
BASE OF OPENING
Содержание INFINITY 800HD BF UBL
Страница 32: ...32 LT 8381 ISS 01 800 HD B F with UBL FAULT FINDING INSTRUCTIONS FAULT FINDING CHARTS ...
Страница 34: ...34 LT 8381 ISS 01 800 HD B F with UBL FAULT FINDING INSTRUCTIONS FAULT FINDING CHARTS 1 ...
Страница 37: ...www charltonandjenrick co uk 37 LT 8381 ISS 01 Register your appliance online today to activate your warranty ...
Страница 39: ...www charltonandjenrick co uk 39 LT 8381 ISS 01 ...
Страница 40: ...40 LT 8381 ISS 01 ...
Страница 42: ...42 LT 8381 ISS 01 ...
Страница 43: ...www charltonandjenrick co uk 43 LT 8381 ISS 01 ...