– 11 –
3.0 System Start-Up
3.1
Air Purge
The filter elements of stage 1, 2 ,3, and 5 filters as shipped are dry and contain
air in the pores. The air will slowly be expelled but may collect in the system
and will need to be purged for peak operating efficiency. Proceed with
Section 3.2 for air purge and initial start-up procedure.
3.2
Start-Up
Start the system by opening the feed water ball valve. Make sure the ball
valve on the storage tank is in the closed position. Check for leaks for at least
10 minutes. Open the product water faucet and let the water flow until all the
air has been expelled from the system. This will take about 30 minutes.
Close the product water faucet. Now open the tank valve. Let the system run
for about 2-hours to fill the storage tank. Then open the clean water faucet on
the sink and empty the tank. Dump and fill for a total of four times. This is to
flush the tank and remove the preservative from the RO membrane, as well as
carbon "fines" from the post filter that may have collected in the tank .
If the waste continues to run after the tank is full, it may mean there is air
binding the autovalve. Empty the tank again by opening the faucet. This will
help to clear more air from the system.