
26
BASIC SERVICE
ELECTRICAL SERVICE (cont’d)
Heater Element Wiring – Booster Tank and Wash Tank Heater Elements
Refer to the illustrations and follow the steps below to properly install terminal jumpers and to
make line power connections to a replacement element.
Step 1.
Hold the element assembly with the calrod coils facing toward you.
Step 2.
Match your element coil to Configuration A, B, C, or D.
Step 3.
Rotate your element coils to match the correct configuration.
Step 4.
Turn the element over and match your element to the correct terminal configuration.
Step 5.
Install terminal jumpers according to the illustration for your voltage requirement.
Step 6.
Install the element and make your line connections 1L1, 1L2, or 1L3 per the illustration.
Configuration A
Booster tank element
View of calrod coils
Terminal Connections
view of element
Configuration B
Booster tank element
View of calrod coils
Terminal Connections
view of element
Configuration C
Booster tank element
View of calrod coils
Terminal Connections
view of element
Configuration D
Wash tank element
View of calrod coils
Terminal Connections
view of element
208V/1 Phase
208-240V/3 Phase
Delta Connection
480V/3 Phase
575V/3 Phase
Delta Connection
208-240V/3 Phase
Wye Connection for
380-415V/3 Phase
208V/1 Phase
208-240V/3 Phase
Delta Connection
480V/3 Phase
575V/3 Phase
Delta Connection
208-240V/3 Phase
Wye Connection for
380-415V/3 Phase
208V/1 Phase
208-240V/3 Phase
Delta Connection
480V/3 Phase
575V/3 Phase
Delta Connection
208-240V/3 Phase
Wye Connection for
380-415V/3 Phase
208V/1 Phase
208-240V/3 Phase
Delta Connection
480V/3 Phase
575V/3 Phase
Delta Connection
208-240V/3 Phase
Wye Connection for
380-415V/3 Phase
1L1
1L2
1L1
1L2
1L3
1L1
1L2
1L3
1L1
1L2
1L3
1L1
1L2
1L1
1L2
1L3
1L1
1L2
1L3
1L1
1L2
1L3
1L1
1L2
1L1
1L2
1L3
1L1
1L2
1L3
1L1
1L2
1L3
1L2
1L1
1L1
1L2
1L3
1L1
1L2
1L3
1L1
1L2
1L3
Содержание D-H1M3
Страница 31: ...29 REPLACEMENT PARTS REPLACEMENT PARTS ...
Страница 34: ...32 REPLACEMENT PARTS Figure 23 D HB D H1 D LF Door Guides Stops and Lift Bracket 8 2 9 4 3 2 2 1 5 6 7 ...
Страница 42: ...40 REPLACEMENT PARTS Figure 27 D HB D H1 D LF Wash Rinse Spray Arms 9 2 9 2 4 1 3 3 6 5 7 8 10 ...
Страница 62: ...1 2 3 60 REPLACEMENT PARTS Figure 37 D HB D H1 D LF Dishracks and PRV ...
Страница 64: ...62 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Страница 65: ...63 ELECTRICAL SCHEMATICS ELECTRICAL SCHEMATICS ...
Страница 68: ......
Страница 69: ......