Generator Location
Please consult your local authority. In some
areas, generators must be registered with
the local utility.
Generators used at construction sites may be
subject to additional rules and regulations.
This generator must have at least five feet of
clearance from combustible material. Leave
at least three feet of clearance on all sides of
the generator to allow for adequate cooling,
maintenance and servicing.
Place the generator in a well-ventilated area.
DO NOT place the generator near vents or
intakes where exhaust fumes could be drawn
into occupied or confined spaces. Carefully
consider wind and air currents when
positioning generator.
Starting the Engine
1.
Make certain the generator is on a flat,
level surface.
2.
Disconnect all electrical loads from the
generator. Never start or stop the
generator with electrical devices plugged
in or turned on.
3.
Turn the fuel cap vent lever to the “On”
position.
4.
Turn the engine switch/fuel valve to the
“On” position.
5.
Move the choke lever to the “Start”
position.
6.
Pull the starter cord slowly until
resistance is felt and then pull rapidly
7.
As engine warms up, move the choke
lever to “Run”.
NOTE
If the engine starts but does not run, make
certain that the generator is on a flat, level
surface. The engine is equipped with a low oil
sensor that will prevent the engine from running
when the oil level falls below a critical threshold.
Smart Throttle
The Smart Throttle switch can be activated
in order to minimize fuel consumption and
noise while operating the unit during times
of reduced electrical output, allowing
the engine speed to idle during periods of
non-use. The engine speed returns to
normal when an electrical load is connected.
When smart throttle is de-activated, engine
runs at high speed.
Connecting Electrical Loads
1.
Let the engine stabilize and warm up for
a few minutes after starting
2.
Plug in and turn on the desired 120 Volt
AC single phase, 60 Hz electrical loads.
DO NOT connect 3-phase loads to the
generator.
DO NOT connect 50 Hz loads to the
generator.
DO NOT overload the generator.
Stopping the Engine
1.
Turn off and unplug all electrical loads.
Never start or stop the generator with
electrical devices plugged in or turned
on.
2.
Let the generator run at no-load for
several minutes to stabilize internal
temperatures of the engine and
generator.
3.
Turn the engine switch/fuel valve to the
“Off” position.
4.
Turn the fuel cap lever vent to the “Off”
position.
Содержание 71000i
Страница 2: ......
Страница 4: ......
Страница 21: ...Specifications Rev 71000i 20100401 E 17 Parts Diagram...
Страница 24: ...Specifications 20 Rev 71000i 20100401 E Wiring Diagram...
Страница 27: ...Notes Rev 71000i 20100401 E 23 Notes...