102006 - AUTOMATIC TRANSFER SWITCH WITH aXis CONTROLLER™ MODULE

UNPACkING

9

Installation Wiring for ATS Utility Socket

 

WARNING

The manufacturer recommends that a licensed electrician or 
an individual with complete knowledge of electricity perform 
these procedures. 

Always be certain that the power from the main panel is 
turned “OFF” and all backup sources are locked out prior to 
removal of the cover or removal of any wiring of the utility 
main electrical distribution panel.

Be aware, automatic start generators will start upon loss of 
utility main power unless locked in the “OFF” position.

Failure to do so could result in serious injury or death.

 

CAUTION

Consult with your Local municipal, State and National 
electrical codes for proper mandatory wiring methods.

Conductor sizes must be adequate to handle the maximum current 
to which they will be subjected. The installation must comply fully 
with all applicable codes, standards and regulations. Conductors 
must be properly supported, of approved insulation materials, 
protected by approved conduit and with the correct wire gauge 
size in accordance with all applicable codes. Before connecting 
wire cables to terminals, remove any surface oxides from the 
cable ends with a wire brush. All power cables must enter the 
enclosure through the enclosure knockouts.

1.  Determine where the flexible, liquid tight conduit will pass 

through the building from the inside to outside. When you 
are certain that there is adequate clearance on each side of 
the wall, drill a small pilot hole through the wall to mark the 
location. Drill an appropriate sized hole through the sheathing 
and siding.

2.  In compliance with all local electrical codes, route the conduit 

along ceiling/floor joists and wall studs to the location where 
the conduit will pass through the wall to the exterior of the 
house. Once the conduit is pulled through the wall and in 
proper position to attach to the HSB generator, place silicone 
caulk around the conduit on both side of the hole, inside and 
outside.

3.  Mount the ATS near the Utility meter socket.

Wiring the ATS

 

NOTICE

US ATS model shown for reference. For Canadian installation, 
refer to ATS Installation Manual.

1.  Have authorized utility personnel pull the utility meter from 

the meter socket.

2.  Remove door and deadfront of ATS.

3.  Connect Utility (L1-L2) to ATS Utility side breaker. Torque to 

275 in-lbs.

4.  Connect Utility N to Neutral lug. Torque to 275 in-lbs.

5.  Connect earth GROUND to GROUND bar. NOTE: GROUND and 

NEUTRAL bonded in this panel.

6.  Connect Generator L1-L2 to Generator side breaker. Torque to 

45-50 in-lbs.

7.  Connect Generator Neutral to neutral bar. Torque to  

275 in-lbs.

Содержание 102006

Страница 1: ...his manual contains important safety precautions which should be read and understood before operating the product Failure to do so could result in serious injury This manual should remain with the pro...

Страница 2: ...atic Transfer Switch with aXis ControllerTM Module 6 Panel Board Safety Information 7 Unpacking 8 Location and Mounting 8 Electrical Grommet s 8 Installation Wiring for ATS Utility Socket 9 Wiring the...

Страница 3: ...e Please always exercise common sense and always err on the side of caution when operating the product to ensure no accident property damage or injury occurs We want you to continue to use and be sati...

Страница 4: ...operating technique the manufacturer does not specifically recommend follow all codes to ensure safety for personnel Many accidents are caused by failing to follow simple and fundamental rules codes...

Страница 5: ...ntial and privileged and shall not be disclosed to or used by or for outside parties without the explicit consent of Champion Power Equipment 152 Alternate Power Source 2 This switch will not transfer...

Страница 6: ...ls and features Save this manual for future reference Champion Automatic Transfer Switch with aXis ControllerTM Module 1 aXis Controller 2 Antenna 3 Generator L1 and L2 Terminals 4 Battery Charger Fus...

Страница 7: ...5 Wire land 5 B B BLACK 6 Wire land 6 B R RED A 120VAC circuit must be installed for battery charging From ATS fuse block or distribution panel install L1 and N to Wire land 2 and 3 respectively Autom...

Страница 8: ...or future reference TOOLS REQUIRED NOT INCLUDED 5 16 in Hex Wrench Mounting Hardware Line Voltage Wire 1 4 in Flat Screwdriver Conduit Fittings Location and Mounting Install the ATS as close as possib...

Страница 9: ...a wire brush All power cables must enter the enclosure through the enclosure knockouts 1 Determine where the flexible liquid tight conduit will pass through the building from the inside to outside Whe...

Страница 10: ...voltage controls route your low voltage wiring into the ATS using code appropriate conduit and fittings Connect the wiring to pin 1 and pin 2 of either AC1 or AC2 as shown in the diagram above Please...

Страница 11: ...lled HSB Off ATS will control the start of the HSB using the AC2 Relay In this setting the AC2 can not be used to manage a load Pins 1 and 3 of the AC2 connector will be used for the HSB startup signa...

Страница 12: ...here are three tabs located at the top of the page ATS GEN and LMM Each tab will display the status for the Transfer Switch Home Standby Generator or Load Management Module s respectively 4 When finis...

Страница 13: ...ICATIONS aXis ControllerTM Module Automatic Transfer Switch Model Number 102006 Enclosure Style NEMA 3R outdoor Maximum Amps 200 Nominal Volts 120 240 Load Management Circuits 4 Weight 43 lbs 19 6 kg...

Страница 14: ...he life of a part or the equipment as a whole Installation Use and Maintenance This warranty will not apply to parts and or labor if the product is deemed to have been misused neglected involved in an...

Отзывы: