4.  On the Champion aXis Controller

TM

 Home Standby Generator 

Settings Page, set the date and time. Use either the drop-
down boxes or the “USE THIS DEVICE’S DATE & TIME” button 
to set the time and date. Confirm and Save the settings 
before continuing.

5.  Set the HSB exercise frequency and schedule. Confirm and 

Save the settings before continuing.

6.  Wireless network settings are not used at this time. The 

default values (shown below) should not be adjusted.

7.  The time, date, and exercise information have now been 

setup for the aXis ATS and HSB. You can close your browser 
and disconnect from the WIFI, or skip to step 2 in the next 
section “ATS & HSB STATUS USING WIFI”.

ATS and HSb Status Using WIFI

1.  Using a WIFI enabled device, connect to the “Champion HSB” 

WIFI network following steps 1, 2, and 3 from WIFI Setup 
Method.

2.  After loading the Home Standby Generator Settings page, 

locate and click the 

 icon at the bottom right corner of the 

page.

3.  You are now viewing the ATS and HSB status page. Items 

such as voltage, frequency, current, etc. can all be viewed 
for both utility and HSB power. All of the information is 
live. There are three tabs located at the top of the page. 

 ATS, GEN, and LMM. Each tab will display 

the status for the Transfer Switch, Home Standby Generator, 
or Load Management Module(s) respectively.

4.  When finished viewing the status of the ATS, Generator, and 

LMM, close your browser and disconnect from the WIFI.

Connecting the Load Management Systems

The following instructions pertain only to aXis Controller

TM

 Load 

Management Modules (LMM) that use Power Line Carrier (PLC) 
communication.  If one or more LMM’s are being installed on the 
home, install them per the installation instructions included with 
the LMM before continuing.

Teaching System

After installation and wiring are complete teach the ATS which 
loads are attached by the following procedure. Teaching the 
system is only required if 1 or more LMM’s were installed OR if 
AC1 OR if AC2 is being used to manage loads.

1.  Turn Champion aXis Controller

TM

 ATS UTILITY circuit 

breaker to the OFF position. Generator will start and run 
automatically.

2.  Confirm managed loads are all operating.

3.  Press and hold the button marked “LEARN” for 8 seconds. 

ATS will shutoff managed loads one at a time until all are OFF. 
ATS will flash LED’s indicating function in process.

4.  After ATS has learned all loads the LMM units will be returned 

to normal operation.

5.  Installation configuration is now held in memory and will not 

be affected by power outage.

Содержание 102006

Страница 1: ...his manual contains important safety precautions which should be read and understood before operating the product Failure to do so could result in serious injury This manual should remain with the pro...

Страница 2: ...atic Transfer Switch with aXis ControllerTM Module 6 Panel Board Safety Information 7 Unpacking 8 Location and Mounting 8 Electrical Grommet s 8 Installation Wiring for ATS Utility Socket 9 Wiring the...

Страница 3: ...e Please always exercise common sense and always err on the side of caution when operating the product to ensure no accident property damage or injury occurs We want you to continue to use and be sati...

Страница 4: ...operating technique the manufacturer does not specifically recommend follow all codes to ensure safety for personnel Many accidents are caused by failing to follow simple and fundamental rules codes...

Страница 5: ...ntial and privileged and shall not be disclosed to or used by or for outside parties without the explicit consent of Champion Power Equipment 152 Alternate Power Source 2 This switch will not transfer...

Страница 6: ...ls and features Save this manual for future reference Champion Automatic Transfer Switch with aXis ControllerTM Module 1 aXis Controller 2 Antenna 3 Generator L1 and L2 Terminals 4 Battery Charger Fus...

Страница 7: ...5 Wire land 5 B B BLACK 6 Wire land 6 B R RED A 120VAC circuit must be installed for battery charging From ATS fuse block or distribution panel install L1 and N to Wire land 2 and 3 respectively Autom...

Страница 8: ...or future reference TOOLS REQUIRED NOT INCLUDED 5 16 in Hex Wrench Mounting Hardware Line Voltage Wire 1 4 in Flat Screwdriver Conduit Fittings Location and Mounting Install the ATS as close as possib...

Страница 9: ...a wire brush All power cables must enter the enclosure through the enclosure knockouts 1 Determine where the flexible liquid tight conduit will pass through the building from the inside to outside Whe...

Страница 10: ...voltage controls route your low voltage wiring into the ATS using code appropriate conduit and fittings Connect the wiring to pin 1 and pin 2 of either AC1 or AC2 as shown in the diagram above Please...

Страница 11: ...lled HSB Off ATS will control the start of the HSB using the AC2 Relay In this setting the AC2 can not be used to manage a load Pins 1 and 3 of the AC2 connector will be used for the HSB startup signa...

Страница 12: ...here are three tabs located at the top of the page ATS GEN and LMM Each tab will display the status for the Transfer Switch Home Standby Generator or Load Management Module s respectively 4 When finis...

Страница 13: ...ICATIONS aXis ControllerTM Module Automatic Transfer Switch Model Number 102006 Enclosure Style NEMA 3R outdoor Maximum Amps 200 Nominal Volts 120 240 Load Management Circuits 4 Weight 43 lbs 19 6 kg...

Страница 14: ...he life of a part or the equipment as a whole Installation Use and Maintenance This warranty will not apply to parts and or labor if the product is deemed to have been misused neglected involved in an...