42
Step 10 Solar Panels
SOLAR PANELS ARE NOT PROVIDED. SEE ACCESSORIES.
Solar Application Requirements
33AH Battery Requirements:
l
Large Metal Control Box for Solar Applications (Model
XLSOLARCONTUL)
l
A minimum of two 10W solar panels in series (Model SP10W12V)
l
A maximum of six 10W solar panels (Model SP10W12V).
Configuration of three sets of two 10W paralleled panels put in series.
l
Two 33AH Batteries (Model A12330SGLPK)
l
Solar Battery Harness (Model K94-37236)
l
Battery Tray (Model K10-36183)
7AH Battery Requirements:
l
Standard Control Box for Solar Applications (Model LA400CONTUL)
l
A minimum of two 10W solar panels in series (Model SP10W12V)
l
A maximum of six 10W solar panels (Model SP10W12V).
Configuration of three sets of two 10W paralleled panels put in series.
l
Two 7AH batteries (29-NP712)
l
Solar Battery Harness (Model K94-37236)
Solar Zones
Solar panel recommendations are based upon the average solar radiation and the temperature effects on batteries in the given zones as shown on the map
below. Local geography and weather conditions may require additional solar panels. Solar powered gate operator installations are not supported in
northern climates due to cold weather and a reduced number of hours of sunlight during the winter months. The cycles/day ratings are approximations.
Ratings vary based on gate construction, installation, and temperature. Solar panels cannot be installed in areas that experience long periods of heavy fog,
lake effect snow, or rain.
APPENDIX