SECTION 4
CESSNA
NORMAL PROCEDURES
MODEL T182T NAV III
GFC 700 AFCS
U.S.
PREFLIGHT INSPECTION
(Continued)
1
CABIN
(Continued)
17. AVIONICS Switch (BUS 1) - OFF
18. AVIONICS Switch (BUS 2) - ON
19. Aft Avionics Fan - CHECK (verify fan is heard)
20. AVIONICS Switch (BUS 2) - OFF
21. PITOT HEAT Switch - ON (carefully check that pitot tube is
warm to the touch within 30 seconds)
22. PITOT HEAT Switch - OFF
23. Stall Warning System - CHECK (gently move the stall vane
upward and verify that the stall warning horn is heard)
24. LOW VOLTS Annunciator - CHECK (verify annunciator is
shown)
25. MASTER Switch (ALT and BAT) - OFF
26. Elevator and Rudder Trim Controls - TAKEOFF position
27. FUEL SELECTOR Valve - BOTH
28. ALT STATIC AIR Valve - OFF (push full in)
29. Oxygen Supply Pressure - CHECK
30. Oxygen Masks - CHECK
31. Fire Extinguisher - CHECK (verify gage pointer in green arc)
2
EMPENNAGE
1.
Baggage Compartment Door - CHECK (lock with key)
2.
Rudder Gust Lock (if installed) - REMOVE
3.
Tail Tiedown - DISCONNECT
4.
Control Surfaces - CHECK (freedom of movement and security)
5.
Trim Tabs - CHECK (security)
6.
Antennas - CHECK (security of attachment and general
condition)
3
RIGHT WING Trailing Edge
1.
Flap - CHECK (security and condition)
2.
Aileron - CHECK (freedom of movement and security)
(Continued Next Page)
T182TPHBUS-00
4-6
Содержание skylance tc T182T
Страница 4: ......
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 38: ......
Страница 40: ......
Страница 68: ......
Страница 104: ......
Страница 152: ......
Страница 154: ......
Страница 190: ......
Страница 192: ......
Страница 208: ......
Страница 216: ......
Страница 220: ......
Страница 342: ......
Страница 344: ......
Страница 384: ......
Страница 390: ......
Страница 396: ......