Starting the build process
STEP 1
Lay out the eight 200mm x 50mm base timbers on the area
where the pool is to be situated.
STEP 2
Fit the base corners using the 12mm nuts and washers.
STEP 3
Use G clamps as shown to aid fitting.
STEP 4
Screw the 6mm coach screws into the outside of the steel
corner plates. Cover the screw head with the plastic caps.
Drill 4mm pilot holes if needed.
STEP 5
Fit the flat steel tie-bars with the 80mm x 10mm bolts
supplied by passing them through the side post shoe as
shown. Make sure the shoes are spaced equally apart.
STEP 6
Line up the shoe and tie bar. Fit the coach bolt from
underneath and secure with a nut and washer.
12mm nuts
& washers
Please note:
The 4 x4 pool does not need these tie bars
Shoe bar timber
& tie-bar bolted
together
19
Corner Skimmer Panel
Skimmer
Return Outlets
Low Suctiom
Top Log 11 + 1/2
Base 1/2 Log
10 + 1/2
9 + 1/2
8 + 1/2
7 + 1/2
6 + 1/2
5 + 1/2
4 + 1/2
3 + 1/2
2 + 1/2
1 + 1/2
End Skimmer Panel
11
10
9
8
7
6
5
4
3
2
1
Low Suctiom
Return Outlets
Skimmer
Please note:
According to the time of the year and weather conditions,
the timber can expand and become tight when fitting the
base corner brackets. The timber may need to be
planed
slightly to adjust the fit. This will not affect the integrity
of your pool structure.