C750 & C750R User
Manual Page 22
EBM model
EBM modular installation steps are same as UPS above, Pay attention to this installation:
Tower Installation
UPS model
Screw the tower feet to the UPS: The LCD of this UPS modular has gravity sensing, the vision window will automatically
adjust the display orientation.
EBM model
1. Place EBM modular to UPS’s right side and align with front-panel.
2. Screw the UPS’s tower foot: one is to UPS’s side, another one to EBM’s side (as above)
2 EBMs are required for R 20kVA UPS, please keep an enough space for installation.
1.
EBM modular must be installed on the lower level of the UPS (as shown below).
2.
2 EBMs are required for R 20kVA UPS, each EBM with a height of 3U;
therefore, 6U installation space is required for 1complete EBM.