C650 & C650R User
Manual Page 13
3.
INSTALLATION
It is recommended to move the equipment to the installation site by using a pallet jack or a truck before
unpacking.
The system may be installed only by qualified electricians by applicable safety regulations.
The EBM cabinets are heavy, please install it with at least two people.
3.1 UNPACKING AND INSPECTING
Unpacking the unit in a low-temperature environment
may cause condensation to occur in and on
the cabinet. Do not install the unit until the inside and outside of the unit are absolutely dry
(hazard of electric shock).
If any equipment has been damaged during shipment, keep the shipping cartons and packing
materials for the carrier or place of purchase and file a claim for shipping damage. If you discover
damage after acceptance, file a claim for concealed damage.
Tower 6/10 kVA C model
Tower 6/10kVA B model
Tower EBM
Rack UPS
Rack EBM