22
Privacy Fence
Chesterfield with Huntington and Westminster Accents
1. Getting Started
• Be sure to call underground prior to digging
• Assemble gates (if necessary) and decide where they will
be located
• Stake out the fence line
• Space and mark post hole locations for gate and sections
(spacer bar/template may be useful)
• Start at gate end post and work outward to determine
proper fence height relative to ground
2. Dig Holes
• Dig holes 30" deep or to frost line
- hole size for 5 x 5 posts = 12"
• Clean holes and check for straight walls
3. Install First Post
• Insert post in hole
• Determine rough height
• Fill hole around post with concrete mix (sand, gravel and
cement) approximately 2" below grade
• Tamp concrete in hole to eliminate air pockets
• Level and square post
4. Install Bottom Rail
• Tape the ends of any rail being inserted into a post that is to
be filled with concrete to prevent concrete seepage
• Insert lock ring in each end of rail
• Depress lock ring tabs and insert rail in post. Tabs will recoil
to hold rail in post
5. Install Second Post
• Insert second post in hole
• Insert bottom rail in post
• Insert block under bottom rail to position at correct
fence height
• Fill hole around second post with concrete mix
• Tamp, level and square fence
• Assembly may be continued by installing all bottom rails first,
or one section at a time
6. Support and Secure
• Level and square fence
• To lower a post, place a wood block from corner to corner on
the post and carefully tap with a mallet
• Never strike the PVC post without a wood support
7. Install Pickets and Rails
• Insert pickets in bottom rail
• Insert top rail over pickets
• Depress lock rings tabs, insert top rail in post
8. Install Accents
• Huntington
- Insert top 2 x 3-1/2 rail with larger holes facing down
into post by depressing bullet clips as rail is inserted
- Bullet clip will drop down to hold rail in place
- Insert pickets thru rail and lock into top fence section rail
(Pickets are factory crimped to hold in place)
- To create desired scalloped effect, longer length pickets will
need to be cut and then crimped, or a bullet clip may be
inserted to hold picket in rail
• Westminster
- Insert bottom and side channels (overlap ends) into position
on rail and posts - secure with #8 x 1-1/2" screws
- Insert lattice into channels
- Slide top channel over lattice
- Insert top 2 x 3-1/2 rail into routed post holes
- Secure top channel 2 x 3-1/2 top rail with #8 x 1-1/2" screws
9. Hang Gate/Install Hardware
• For complete details, see gate installation instructions in
hardware box
• Position gate between posts
• Allow 1" gap for hinge and 3/4" for latch and gate swing
• Block up gate to square with fence; rails should be level
• Gate hardware must be mounted to two sides of the post
10. Solidify Gate Posts
• It is critical that gate hinge and latch posts are solid to ensure
proper gate functionality. Two methods are available:
A. Aluminum gate post stiffener
- Slide aluminum gate stiffener inside hinge,
latch or end posts
- Drive a screw through the vinyl into the aluminum
stiffener at the bottom of the post
- Insert post into the ground
- Fill hole with concrete around outside of post
B. Concrete and rebar*
- Use two pieces of 1/2" rebar in each hinge, latch and
end post
- Rebar should extend from the bottom of the hole to
12" from the top of the post
- Hold rebar in opposite corners of post with rebar
separator clips
- Fill post with concrete mix to cover rebar and
hardware fasteners
- Tamp post with a rubber mallet to eliminate air pockets
- Leave gate on blocks for 72 hours to allow concrete to set
11. Install Caps
• Install post caps
• Caps may be secured with glue, silicone adhesive or
#8 x 1-1/2" screws, caps and washers
* Caution – In climates that experience freeze-thaw cycles, this installation method could result in post cracking over time. This would not be covered by the warranty.
Содержание Bufftech
Страница 2: ......