F I G . 1
F I G . 1
F I G . 1
F I G . 1
F I G . 1
F I G . 1
F I G . 1
F I G . 1
F I G . 1
F I G . 1
215
F I G . 2
F I G . 2
F I G . 2
F I G . 2
F I G . 2
16-18mm
221
221
FIG.3B
FIG.3B
FIG.3B
FIG.3B
FIG.3B
217
217
F I G . 2
F I G . 2
F I G . 2
F I G . 2
F I G . 2
FIG.3A
FIG.3A
FIG.3A
FIG.3A
FIG.3A
221
221
217
217
213
213
215
80
100
Step 19 Setup
All of the push rods now need to be fine adjusted to
the proper length. First adjust the roll push rods
(2002-215 Bag #8) so that the top edge of the bell
cranks are 80 degrees with the roll servo in the
neutral position( Figure1 ). Now adjust the
collective rods (2002-217 Bag #8) so that the
pitch arms are in the center of the slot within
the main frame at collective half stick. When
installing the control balls on the collective servo
space the balls 6mm-8mm from the center of the
servo wheel if using a standard radio. If using a
computer radio space the balls 8mm from the
center of the output wheel. This will insure that
you don't have too much collective travel.( F
IGURE
2 ).
With this done four swashplate rods
( 2002-221Bag#8) so that the swashplate
will be16-18mm above the upper
bearing block ( Figure 3A/3B ).
1 9
1 9
1 9
1 9
1 9