The battery (D3/D5 Operators only)
Gearbox oil level
Power Supply
CENTSYS systems that are fitted with maintenance-free lead-acid batteries, should
provide at least three years of normal service life.
For sites utilizing an external 35Ah battery, ensure that the level of liquid (electrolyte
level) is correct. Check for corrosion of the battery terminals. Clean and apply copper
based grease as necessary.
Check the oil level as described in the section, Lubrication, of the Installation Manual.
Should the installation manual be unavailable, please refer to the Online Manuals on
our website, www.centsys.com.au. Alternatively, please contact your CENTSYS
installer.
All Centurion Systems (Pty) Ltd operators have power supplies separate to the
controllers. In the case of product malfunction, the power supply fuses should be
checked.
NOTE: D5/D3 OPERATOR PCB SHOWN
Red LED indicate
the mains supply
is switched on.
Depress and
twist to remove
fuse holder
GREEN LED
CHARGE/POWER
Ensure that the enclosure which houses the 35Ah
battery can adequately vent any battery gases
generated.
WARNING
Page 21
Содержание A10
Страница 1: ...D3 D5 and A10 User guide TM TM TM DOMESTIC AND INDUSTRIAL SLIDING GATE OPERATORS ...
Страница 29: ...Notes Notes ...
Страница 30: ...Notes Notes ...
Страница 31: ...Notes Notes ...
Страница 32: ...www centsys com au 0 07 B 0031 D3 D5 and A10 User guide 10Jul2012 ...