ROTARY DOSING VALVE INSTALLATION (RSE) (ADDITIONAL EQUIPMENT)
To install the rotary dosing valve, the original pellet supply pipe must be removed from the burner.
Then it is necessary to install a rotary dosing valve.
Important:
use a seal left over from the original pellet supply pipe
Note:
the rotary dosing valve flange is designed so that the dosing valve can be directed to the
side required (see figure).
ROTARY DOSING VALVE AS ADDITIONAL EQUIPMENT MUST BE
ORDER WHEN ORDERING A BOILER, BECAUSE TO ADJUST THE
ELECTRIC CABINET. IN CASE THAT THE BOILER IS STANDARDLY
DELIVERED WITHOUT PREPARATION FOR THE INSTALLATION OF A
ROTARY DOSING VALVE, IT IS NECESSARY TO CONTACT
C E N T R O M E TA L D . O . O . T O S E E T H E P O S S I B I L I T Y O F
UPGRADING THE ELECTRIC CABINET.
360°
360°
the "knees" can be turned
to either side
Prior to any work on the boiler, the el. power must be switched OFF
on the device to disconnect all poles of the power supply.
2
Technical instructions
PelTec-Compact
16
Technical instructions
EKO-CKS P UNIT