BOILER START (TURN ON):
Operation
Info
S TA R T?
For boiler start is neccesary to press ON / OFF button. After pressing ON / OFF button on display will be
displayed window for boiler start confirmation. Press „OK” to confirm boiler start.
BOILER STOP (TURN OFF):
For boiler stop is neccesary to press ON / OFF button. After pressing ON / OFF button on display will be
displayed window for boiler stop confirmation. Press „OK” to confirm boiler stop.
Operation
Info
S TO P?
D5
D5
FOR DETAILED DESCRIPTION OF BOILER USING SEE „TECHNICAL INSTRUCTION FOR
BOILER CONTROL UNIT”!
2
Technical instructions
PelTec-Compact
24
Technical instructions
EKO-CKS P UNIT