
Primary and secondary wings
seeking initial position. Please
wait and try again.
- if this message is shown on display than
wait for primary and secondary air
actuators
- primary and secondary air is
ready for work when indicator
stop blinking
Primary and secondary
air indicators.
- on display is displayed message
"IGNITION 1/3"
- cover the refractory stone
with one row
of wood logs (be careful to not plug hole
on refractory stone (detail A)
- cover the wood logs with fine chopped wood
(use enough fine chopped wood to cover
wood logs below)
- height of fine chopped wood layer must
conform a approx. height of first row of wood
logs
- cover the fine chopped wood with crumped
paper (use enough crumpled paper to cover
fine chopped wood) (detail B)
- place the wood logs on crumpled paper
- fill the fuel loading chamber with wood logs
(detail C)
- close upper and lower doors
- leave middle door opened
- ignite the fire throuh middle boiler door
(detail C)
- press enter button
”
“
Use the left side of the boiler - Fuel: wood, ignition
Technical instructions CONTROL UNIT
BioTec Plus
16