![Centrometal BIO-PEK 17 B Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/centrometal/bio-pek-17-b/bio-pek-17-b_technical-instructions_2582714034.webp)
Start up
3.4.
START UP
The device needs a constant supply of combustion air. The windows and doors at the
installation site must not therefore be airtight. This is especially important in installation rooms
with less than 4 m3 per kW of nominal heat output.
Vapour extraction systems, fans and other fireplaces may have a negative impact on
c
ombustion. Provide a supply air opening if necessary.
Check if the entire system is filled with water and airvented.
Check if all security elements are properly built in and in a good shape. Check if the exhaust
flue tube is properly fixed (gas-proof).
Remove all objects you eventually might have forgotten to take out of the boiler (for
example the technical manual).Check if the firing regime switch (see image 5.) and the hinged
flap (see image 3.) are operating properly. It is also necessary to check if all movable elements
are properly positioned:
- movable front grill (image 11.) enables easier cleaning of the interior when the lower
door is pened. The grill can be removed if we pull it out of its supports, which are situated
inside the frame of the lower door.
- the box for ashes has to be put into the ashtray (under the grill mechanism).
- equipment (handle for mechanism, scraper, cleaning brush and extension for conection to
chimney) placed in the firebox of the boiler.
- check if the flue exhaust tube is hermetically tightened.
-
check if the grate is positioned into the center
- lifting and lowering to verify the possibility of raising and lowering the combustion chamber
and the grids come down for heating, cooking and baking, or pick up only in cooking and
baking.
-
set the upper heating plate so that its edges do not touch the stainless steel parts, which
could be unnecessarily warmed.
-
pull out the hinged flap until the delimiter (see image 3)
- set up the preinstalled draught regulator to the value „8“(image 9.)
- set the firing regime switch /shutter/ (heating/baking) into the position „baking“ (i.e.
completely into the downl position) (see image 5.)
- put the wood into the combustion chamber and set the fire. Few minutes later, after the wood
pieces have started to burn, put desired quantity of wood into the combustion chamber
- push the hinged flap back until the delimiter (see image 3)
- check the operating regime of the boiler (BAKING/COMBINED/HEATING)
- set up the draught regulator so that the temperature inside the boiler does not pass the
temperature between 85-90°C.
- put the wood into the combustion chamber and set the fire. Few minutes later, after the
wood pieces have started to burn, put desired quantity (not higher than is shown in the
image
2
) of wood into the combustion
chamber
During the first start up of the boiler, do not put anything on the upper heating plate, until its
protection colour coating has been entirely burned out.
34
Technical data
BIO-PEK B 17, 23, 29
ENG
Содержание BIO-PEK 17 B
Страница 90: ...90 Istruzioni tecniche BIO PEK B 17 23 29...
Страница 91: ...91 Istruzioni techniche BIO PEK B 17 23 29...