DP-7 Quick Start Guide
1.
Install MPU11 Probe cable assembly #11085 if necessary. Refer to Common Cables
picture on page 12, connection diagram on page 13 and appropriate appendix for
parameter settings and upgrade information.
2. Connect coil cord to DP-7 and to bulkhead connector on probe cable assembly
#11085. See probe features and general description page 1. LED indicating light will
alternate colors during power up and initialization and the probe outputs are exercised
also as a diagnostic tool at this time
3. Set system control parameters. See “Table of Contents” to locate application specific
appendix for a list of parameter settings and upgrade information.
4. Confirm machine is responding to DP-7 input by running an automatic cycle without the
probe in the spindle and manually touching the DP-7 stylus mount boss. Refer to
control operator's manual for automatic probing cycles. Follow the “Initial Control/Probe
Setup Procedures” in the appendix appropriate for your control.
5. Install the DP-7 and tool holder in the spindle then install the stylus in the DP-7. See
Stylus handling and installation procedures on page 4 and perform run-out adjustment
as shown on page 5.
6. Review stylus travel limits on page 3 and perform an automatic probing cycle at
reduced speed.
7. Calibrate stylus tip size. See procedures on page 9.
8. Review Adjustments page 3,4 and 5 and Maintenance and Care page 9 to keep DP-7
in good operational condition.
9. Probe is now ready to use.