![Cedar Summit Forest Hill Retreat Play System F23180 Скачать руководство пользователя страница 68](http://html1.mh-extra.com/html/cedar-summit/forest-hill-retreat-play-system-f23180/forest-hill-retreat-play-system-f23180_installation-and-operating-instructions-manual_2578708068.webp)
68
Step 31: Cafe Canopy Assembly
Part 2
C:
At the front of the fort, attach 2 Z-Frames to the (1400) Post with 1 (S6) #12 x 1” Pan Screw per frame. (fig.
31.4 and 31.5)
D:
From underneath the fort, attach canopy to (2588) Floor Gap with 5 (S5) #8 x 1/2” Pan Screws (with #8 flat
washer). (fig. 31.6)
E:
Attach each P-Frame to (1400) Posts, through the tarp, with 1 (S6) #12 x 1” Pan Screw and 2 (S5) #8 x 1/2”
Pan Screw (with #8 flat washer) per side. (fig. 31.6)
Fig. 31.4
Fig. 31.5
S6
Under canopy view
P
Z
Hardware
9 x
#8 x 1/2” Pan Screw (#8 flat washers)
4 x
#12 x 1” Pan Screw
S5
S6
Fig. 31.6
Canopy
removed for
clarity
P
x 1 per
side
x 1 per
side
1400
2588
S5
S6
1400
1400
S5
w/ #8 Flat
Washer
w/ #8 Flat
Washer, x 2
per side
2586
2588
Front Wall
Содержание Forest Hill Retreat Play System F23180
Страница 92: ...NOTES 92 support cedarsummitplay com ...
Страница 93: ...NOTES 93 support cedarsummitplay com ...
Страница 94: ...NOTES 94 support cedarsummitplay com ...
Страница 95: ...NOTES 95 support cedarsummitplay com ...