![Cedar Summit Forest Hill Retreat Play System F23180 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/cedar-summit/forest-hill-retreat-play-system-f23180/forest-hill-retreat-play-system-f23180_installation-and-operating-instructions-manual_2578708039.webp)
39
Fig. 13.6
2586
0839
2587
0839
(hidden)
0840
Step 13: Front Frame Assembly
Part 3
55 x
#8 x 1-1/2” Wood Screw
11 x
CE Gap Board 1 x 4 x 38-3/4”
Hardware
Wood Parts
x 5 per
board
S2
S2
0839
G:
In between both (0839) CE Gap Board and (0840) CE Gap Board place 11 (0839) CE Gap Boards making
sure they are evenly spaced. Attach to (2587) Floor Joist and both (2586) Floor Front Back using 5 (S2) #8 x
1-1/2” Wood Screws per board. (fig. 13.6)
(hidden)
2586
x 11
Содержание Forest Hill Retreat Play System F23180
Страница 92: ...NOTES 92 support cedarsummitplay com ...
Страница 93: ...NOTES 93 support cedarsummitplay com ...
Страница 94: ...NOTES 94 support cedarsummitplay com ...
Страница 95: ...NOTES 95 support cedarsummitplay com ...