![Cedar Summit Forest Hill Retreat Play System F23180 Скачать руководство пользователя страница 64](http://html1.mh-extra.com/html/cedar-summit/forest-hill-retreat-play-system-f23180/forest-hill-retreat-play-system-f23180_installation-and-operating-instructions-manual_2578708064.webp)
64
Step 28: Attach Hand Grip
Pre-drill all holes using a 3/16” drill bit before installing the Lag Screws.
A:
On the Back Wall measure 5-1/2” up each (1400) Post from the top of floor boards then attach 1 Hand Grip
with on each (1400) post with 2 (LS1) 1/4 x 1-1/2” Lag Screws (with flat washer) per Hand Grip. (fig. 28.1)
Back Wall
1400
Fig. 28.1
1/4” flat
washer
Hand Grip
Hardware
4 x
1/4 x 1-1/2” Lag Screw (1/4” flat washer)
LS1
Other Parts
2 x Hand Grip
5-1/2”
2586
1400
Floor
Boards
LS1
LS1
Hand
Grip
Содержание Forest Hill Retreat Play System F23180
Страница 92: ...NOTES 92 support cedarsummitplay com ...
Страница 93: ...NOTES 93 support cedarsummitplay com ...
Страница 94: ...NOTES 94 support cedarsummitplay com ...
Страница 95: ...NOTES 95 support cedarsummitplay com ...