![Cedar Summit Forest Hill Retreat Play System F23180 Скачать руководство пользователя страница 28](http://html1.mh-extra.com/html/cedar-summit/forest-hill-retreat-play-system-f23180/forest-hill-retreat-play-system-f23180_installation-and-operating-instructions-manual_2578708028.webp)
28
Overlap cedar roofing
5155
Flush to edge
Step 8: Roof Assembly
Part 2
Fig. 8.4
Wood Parts
Hardware
12 x
#8 x 7/8” Truss Screw
4 x
Cedar Roofing 3/8 x 3-1/2 x 47-1/2”
5155
S0
Fig. 8.2
Fig. 8.3
5155
S0
S0
1425
x 3 per
board
1424
D:
At the peak attach 1 (5155) Cedar Roofing per side to both Roof Support Assemblies and the Roof Joist
Assembly using 3 (S0) #8 x 7/8” Truss Screws per roofing. (fig. 8.2) One (5155) Cedar Roofing should overlap the
other. (fig. 8.3)
E:
At the bottom of the the Support and Joist Assemblies pre-drill 1” above the existing holes in (5155) Cedar
Roofing and then attach to each side with 3 (S0) #8 x 7/8” Truss Screws per roofing. (fig. 8.2) The bottom of
(5155) Cedar Roofing should be flush to the bottom of each (1424) Roof Support. (fig. 8.4)
1”
S0
1425
1424
1424
1424
1424
5155
Содержание Forest Hill Retreat Play System F23180
Страница 92: ...NOTES 92 support cedarsummitplay com ...
Страница 93: ...NOTES 93 support cedarsummitplay com ...
Страница 94: ...NOTES 94 support cedarsummitplay com ...
Страница 95: ...NOTES 95 support cedarsummitplay com ...