Hardware
6 x
1/4 x 2-1/2” Wafer Lag
WL5
WL5
Step 5: Slide Wall Panel Assembly
Part 2
Note:
Make sure panels are square and flush to each other. (fig. 5.3)
D:
Pre-drill with a 3/16” drill bit, then fasten the (2527) Chalkwall Panel and (2473) Post to (2529) SL Side Panel
with 3 (WL5) 1/4 x 2-1/2” Wafer Lags per panel. (fig. 5.3)
2527
2473
2529
WL5
Fig. 5.3
28
Содержание Abbeydale Clubhouse F23920
Страница 90: ...NOTES 90 support cedarsummit com ...
Страница 91: ...NOTES ...