MODEL NO:
JAVA GIANT 2 (USA & CANADA)
JAVA GIANT 2 (USA & CANADA)
PHASE:
1 PHASE
1 PHASE
1 PHASE
1 PHASE
3 PHASE
VOLTS:
120
230
230
230
230
TOTAL
KW
1.7
6
9
18
18
NO. OF
HEATERS
1
3
3
3
3
AMPS
15
26
39
78
45
HZ.
60
60
60
60
60
RECEPTACLE
NEMA
L-5-15
L6-30R
HARDWIRED
HARDWIRED
HARDWIRED
CIRCUIT
BREAKER
15A
30A
50A
100A
60A
ELECTRICAL SPECIFICATIONS
UNITS OVER 30 AMPS MUST BE HARDWIRED. CORDS NOT SUPPLIED. FOR ALTERNATIVE WIRING METHODS, SEE HEATER POWER WIRING DIAGRAM.
MODEL NO:
JAVA GIANT 2 (USA & CANADA)
JAVA GIANT 3 (USA & CANADA)
WIDTH
IN
14.125
20.375
DEPTH
IN
24.25
24.25
HIGHT
IN
40.5
40.25
HOPPERS
QTY LB. COFFEE
2 5.25
3 5.25
TANK
GAL.
7.5
10.5
ART AREA
IN
13.75 x 16.75
20 x 16.75
SHIPPING
WEIGHT LB.
155
195
MECHANICAL SPECIFICATIONS
Height: add 4" for legs; Depth: add 2" for clearance for waterline hookup;
FAST START UP PROCEDURE
Water Inlet Connection
This equipment is to be installed to comply with the applicable Federal, State, or local plumbing codes having jurisdiction. In addition:
1. A quick disconnect water connection or enough extra coiled tubing (at least 2x the depth of the unit) so that the machine can be moved for
cleaning underneath.
2. An approved back flow prevention device, such as a double check valve to be installed between the machine and the water supply.
The JAVA GIANT 2/3 (USA and CANADA) is equipped with a
3/8"
Flare Water Inlet Fitting
.
HIGHLY RECOMMENDED:
A WATER SHUT-OFF VALVE and A WATER FILTER, preferably a combination Charcoal/Phosphate Filter, to remove odors and inhibit lime and
scale
build up in the machine. Note: In areas with extremely hard water, a water softener must be installed in order to prevent a malfunctioning of the
equipment and in order not to void the warranty.
STARTUP PROCEDURE
Caution: Make sure that the Heater Switch, located behind right hopper with door opened, is in the OFF position.
1. JAVA GIANT2/3 (USA & CANADA) - Connect the
3/8" dia
copper waterline to the
3/8" flare
water inlet fitting of the valve.
2. Plug the power cord into a proper receptacle.
3. Activate the
Power Switch
(Toggle Up). The door display panel and the green dispense buttons will light up and the
tank will start filling.
Allow approximately
4-6
minutes for the tank to fill.
4. Activate the
Heater Switch
. Allow approximately 20-30 minutes for the water to reach a preset temperature of 195°F.
The heat up time will depend on the water inlet temperature, the input voltage and the wattage of the elements in the machine.
5. Place decanter under nozzle and press dispense switch. The machine will dispense water at the rate of 4 oz. per second.
Repeat it several times for each dispense switch to check for consistent output.
6. While the tank is heating up, remove the hoppers, load them with products and reposition them back in the machine.
When the heater light goes OFF, the tank has reached its brew temperature and the machine is ready to dispense Coffee.
Содержание JAVA GIANT 2
Страница 1: ......
Страница 13: ...Z DRAWINGS NE000 ne52a dwg 07 08 2002 09 29 34 AM 1 0 983246 CECILWARE CORPORATION...
Страница 14: ...Z DRAWINGS NE000 NE60A dwg 07 08 2002 09 18 04 AM 1 0 983282 CECILWARE CORPORATION...
Страница 15: ...Z DRAWINGS NE000 NE61A dwg 07 08 2002 09 18 46 AM 1 1 51271...
Страница 17: ...BLK WATER INLET VALVE WATER LEVEL PROBES LIQUID LEVEL CONTROL WATER RED WHT BLU YEL GRN...