Cecilware BC2-IT
BC302-IT Скачать руководство пользователя страница 2

 

2

SPECIFICATIONS 

ELECTRICAL SPECIFICATIONS

 

MODEL NO.

 

BC301-IT BC2-IT

 

BC302-IT

 

Volts 120/240 

120/240 

120/240 

Watts 4100 

6200 

6200 

Amps 18 

27 

27 

Wall Outlet (Receptacle) 
Power Cord CE202 – 30A 

optional

 

6-20R 6-30R 6-30R 

All Brew Centers are single phase with 3 wires plus a ground with cord and plug, except Eport 220V, 
1 PH, (UROPEAN). 

MECHANICAL SPECIFICATIONS

 

MODEL NO.

 

BC301-IT (in) 

BC2-IT (in)

 

BC302-IT (in)

 

Tank Capacity (US gal.) 

3.1 

6.2 

6.2 

Cups/Brew Cycle 

12/24/36 

2 x 36 

2  x 12/24/36 

Cups/Hour 240 

400 

400 

 

 

 

 

Height (includes 4” legs) 

31 

31 

31 

Width 9 

¼ 

18 

18 

Depth (+2”for ¼"water connection) 

17 ½ 

17 ½ 

17 ½ 

Ship Weight lbs. 

65 

105 

110 

 

START-UP PROCEDURE 

 
1.  PLUG THE POWER CORD INTO A PROPER RECEPTACLE. 
2.  ACTIVATE THE POWER SWITCH ON 

(Toggle Up)

located in the lower left corner in back of Brewer. 

3.  PUSH THE POWER BUTTON (RED) ON THE TOUCHPAD ON THE FRONT PANEL.   

     The power switch controls all power including the Heater Elements in the tank and the Warmers.   

The Brewer will automatically start filling the tank, then it will start to heat up the Water in the tank, 
until it reaches the proper preset temperature (200

°

F)  (About 20 minutes).   The LCD window will 

display a series of messages: 

 

                                          
 
 

4.  PLACE PAPER FILTER AND COFFEE IN THE FUNNEL, AND INSERT FUNNEL IN THE BREWER. 
5.   PUSH THE BREW BUTTON.  YOU NEED NOT WAIT FOR THESE MESSAGES TO COME UP FIRST

      After the brew button is pressed, when the “READY TO BREW” message comes on, the Brewer 

automatically begins brewing coffee.  The LEDs will light up and stay on during the brewing cycle. 

 
 

NOTE:  THE BREWER CAN BE PROGRAMMED TO START ITSELF UP AT ANY DESIRED TIME AND 
SHUT ITSELF OFF AT ANY DESIRED TIME, PROVIDED THAT THE MAIN POWER SWITCH IN THE BACK 
OF THE BREWER IS KEEPT ON (Toggle Up). 

 

RECOMMENDED COFFEE AMOUNT FOR BREWING

 

 

 

2.5 oz. for one (1) decanter, ½  US gal. (12 cups) 
5 oz. for two (2) decanters, 1 US gal. (24 cups)   
7.5 oz. for tree (3) decanters, 1½  US gal. (36 cups)

 

 

CECILWARE 

shows day

 

    NG39A   

shows

 

time

 

FILLING  

shows day 

  TANK

    shows

 

time

HEATING     

shows day

 

shows temp  

shows t

i

me

 

READY    

shows day

 

TO BREW  

shows

 

time

Содержание BC2-IT BC302-IT

Страница 1: ...0th Avenue Long Island City NY 11105 TEL 718 932 1414 FAX 718 932 7860 MODELS Single BC301 IT Twin BC2 IT BC302 IT MANUAL Specifications Installation Operating Instructions Programming Instructions Ca...

Страница 2: ...the tank and the Warmers The Brewer will automatically start filling the tank then it will start to heat up the Water in the tank until it reaches the proper preset temperature 200 F About 20 minutes...

Страница 3: ...totalizers for product marketing information and inventory control 7 Advanced system diagnostics that continuously monitor the status of valves sensors and heaters to ensure proper operation and aid i...

Страница 4: ...h as a double check valve to be installed between Brewer and water supply WATER CONNECTION The Brewer comes equipped with a inch compression water inlet fitting located in the back Use a inch copper t...

Страница 5: ...ol brewing Service Mode This mode becomes active when the hidden keys under the Cecilware Logo located on the upper left hand side of the keypad and the first letter of the Model Name located on the u...

Страница 6: ...displayed during the initial filling of the water tank first fill Once the water in the reservoir tank has reached the appropriate fill level this screen is retired Heating State HEATING DDD K TTTF H...

Страница 7: ...e Dilution Fill Constant Calibration State is entered from the Heating State or the Ready State by simultaneously pressing the Up Arrow Key and the Brew Key The system will immediately energize the Di...

Страница 8: ...to easily start a Brew Cycle while preventing unauthorized users from doing the same The presence of the KL symbol on the screen in Normal Mode indicates the status of KeyLock see Normal Mode Descript...

Страница 9: ...for any water remaining in the funnel to drain out DILUTION DILUTION 36 ON OFF Description The Dilution feature gives the user the ability to add hot water directly to the brew without passing through...

Страница 10: ...maximum length of time a brew remains fresh while being warmed Once the Warmer Timer has expired an alarm is generated An alarm consists of a blinking warmer LED and optionally the audible alarm buzze...

Страница 11: ...ust set the systems Real Time Clock Minutes placeholder ADJUST HOURS ADJUST HOURS DAY MM SS Description The Adjust Hours function allows the user to adjust set the systems Real Time Clock Hours placeh...

Страница 12: ...ntrol Card or Water Temperature Sensor OVER FLOW SYSTEM ERROR OVER FLOW Description This screen is displayed and the unit is disabled when the Over Flow Level Sensor is detecting the presence of water...

Страница 13: ...ASS Y 6 V210Q 1 V210Q 2 FUNNEL ASS Y BLACK 7 SF74Q 1 SC81Q 1 TANK WELDMENT ASS Y 8 R615A 1 SC86A 1 BASE WARMER COVER 9 G108A 1 G108A 2 WARMER ELEMENT 10 M090A 2 M090A 4 GROMMET F HEAT SHIELD 11 U485A...

Страница 14: ...83A 1 M483A 2 SILICONE HOSE 312 ID x 7 L 11 K671Q M197A 1 1 K671Q M197A 2 2 SPRAY HEAD FITTING ASS Y WITH RUBER WASHER 12 SD06Q E107A K668A 1 1 1 SD06Q E107A K668A 2 2 2 SPRAY HEAD BASE ASS Y SPRAY HE...

Страница 15: ...QTY P N BC2 IT BC302 IT QTY DESCRIPTION 1 L069A 1 L069A 1 POWER SWITCH 2 CD257 1 CD257 1 WATER INLET VALVE 3 B083A 1 B083A 1 TERMINAL BLOCK 4 CE202 1 CE202 1 POWER CORD 5 C396Q 1 C396Q 1 FUSE HOLDER A...

Страница 16: ...m of 3 min in the sanitizing solution Let all sanitized parts drain and dry naturally DO NOT WIPE THEM DRY Before using the sanitized unit or parts with food stuffs rinse all parts thoroughly with wat...

Страница 17: ...b Too much water in tank c Spray Head Fitting is clogged d Water Valve blocked by scales a Replace Water Dispense Valve b Dispense some water from tank c Clean Spray Head Fitting d Replace or clean V...

Страница 18: ...CD window Check the probe as follows Turn on the power from touchpad and water supply Check inside the tank to make sure the water is not touching the Probe Pull the wire and terminal out of the Probe...

Страница 19: ...GLE DISPENSE VALVE is factory adjusted to dispense 0 5 oz sec of water during the brew cycle spray duration b The DOUBLE DILUTION DISPENSE VALVE is factory adjusted on both sides to dispense 0 22 oz s...

Страница 20: ...6 8 12 14 J2 21 17 19 22 18 20 120VAC THERMISTOR L671A L2 N L1 TO SAFETY RELAY TO J3 PIN 3 TRIAC L623A 40A MT2 20 GA MT1 G 16 GA 20 GA TO FUSE 16 GA TO HEATER P5 KEYS WARM WARM PWR BERG CONNECT0RS P2...

Страница 21: ...MT2 G 7 6 T1 CH82A 120VAC 8VAC FUSE 6 AMP 17 18 18 17 SAFETY RELAY L553A K2 4 2 K1 3 1 100W 5 4 3 2 B190A SAFETY RELAY 10 9 1 3 2 4 5 7 6 8 13 14 11 12 15 16 1 10 1 3 5 7 2 4 6 8 13 11 9 15 14 12 16...

Отзывы: