13
NOTE
. For all the functions adjusted by means of the
adjustment bar, the initial default value can be reset.
This operation be performed by pressing the knob
B
for more than 2 seconds only once the adjustment bar
appears on the display screen
A
.
(Arc Length - Spot Time - Pause Time - Inductance,
Burnback – Soft Start).
8 MAINTENANCE
All maintenance jobs must be performed by
professional personnel according to the CEI 26-29
(IEC 60974-4) standard.
8.1 GENERATOR MAINTENANCE
In case of maintenance inside the appliance, make sure
the switch
F
is in “O” position and that the power supply
cable is disconnected from the mains.
Periodically, also clean the inside of the appliance and
remove any metal dust using compressed air.
8.2 HOW TO PROCEED AFTER MAKING REPAIRS.
After making repairs, always ensure the wires are fully
insulated between the primary side and the secondary
side of the machine. Avoid the wires coming into contact
with moving parts or parts that heat up during operation.
Fit all the clamps back as on the original machine so as to
avoid any contact between the primary and secondary in
case of accidental lead breakage or disconnection.
Also
fi
t the screws back on with the toothed washers as
on the original machine.
Содержание MONO STAR
Страница 64: ...64 3 C D B A A B C D 4 E F G F G E 5 MIG IEC CEI EN 60974 9 D 2 D 1 2...
Страница 65: ...65 1 2 3 4 5 6 7 8 9 PROCESS PARAMS 8 10 l min A A B A 0 6 E71TGS 0 9mm PROCESS PARAMS 0 9mm 3 4 5 6 7 8 9...
Страница 69: ...69...
Страница 70: ...70...
Страница 72: ...72...