VX 820 ITS
Installation & service manual (version 1.0)
v1.0, Internal
Action
Explanation
14 Wait until the installation process is
completed.
When the installation has been completed
successfully, the following notification will
appear in AdminLight: 'INSTALLATION
SUCCESSFUL'. Next, a configuration
session is started.
15 Wait until the configuration session is
completed.
When the configuration session has been
completed successfully, the following
notification will appear in AdminLight:
'CONFIGURATION FINISHED'. Next, keys
may be uploaded to the PIN pad.
16 Wait until the keys are uploaded.
When the keys are uploaded, the
following notification will appear in
AdminLight: 'LOADING KEYS FINISHED'.
Next, an acquirer parameter session is
started.
CID087A/15042015
© CCV Services B.V.
20 / 45