CCI Thermal Technologies Fastrax G Series Скачать руководство пользователя страница 63

M80000.Rev.2.0

2

As a leader in advanced heating and filtration solutions with facilities across North America, CCI Thermal Technologies Inc. manufactures 

six of the top brands in industrial heating in addition to a comprehensive line of engineered industrial filtration products including:

VISIT WWW.CCITHERMAL.COM FOR DETAILED PRODUCT INFORMATION.

DriQuik™ provides components for infrared drying ovens. DriQuik™ utilizes a pioneered 

radiant  oven  technology  established  in  the  1930s  providing  the  industry  standard  in 

infrared radiant heating components.

Norseman™  is  the  most  technologically  advanced  line  of  explosion-proof  electric  air 

heaters and heating accessories, including both forced air heaters and natural convection 

heaters,  as  well  as  unit  heaters,  panel  heaters  and  thermostats.  Norseman™  offers 

innovative,  low  maintenance  solutions  for  a  wide  range  of  applications  in  a  variety  of 

industrial and commercial environments. Custom engineered heaters or heating systems 

are available for specialized applications.

3L Filters™ has satisfied the most demanding industrial filtration requirements for over 40 

years.  A broad range of standard and custom products includes liquid filters, strainers, 

separators, pressure vessels, and engineered products and systems.  3L Filters™ has 

special  expertise  for  nuclear,  petrochemical,  water  treatment  and  environmental 

applications.

Fastrax

®

  has  manufactured  railroad  track  and  switch  heating  since  1995.  Fastrax

®

 

engineers  complete  heating  packages  for  the  rail  industry.  Fastrax

®

  track  and  switch 

heaters are designed to provide the most efficient heat transfer on rail equipment and 

components for the coldest environments. In addition to heaters, Fastrax

®

 manufactures 

fully automatic energy saving controls to complete the rail heating system.

Caloritech™ electric heaters, heating elements and heating accessories are well-known 

in  the  industry  for  their  quality, reliability,  performance  and  versatility.  In  addition  to 

standard "off the shelf" industrial heaters and heating systems components, Caloritech™ 

also offers engineered heating solutions custom designed, manufactured and tested to 

satisfy  customer  specifications.  No  matter  what  your  application  or  environment, 

Caloritech™ has a solution to fit your heating needs.

Ruffneck™ is renowned for its rugged, reliable and versatile heavy-duty explosion-proof 

heaters,  heating  systems  and  heating  accessories.  Ruffneck™  has  a  long  and  proud 

history of supplying quality heating products for the harshest industrial environments to a 

worldwide customer base for over 30 years. Ruffneck™ is well-known in the industry for 

its "ship the heat in a week" policy, where 95% of all standard orders are shipped within 

one week of order placement.

Cata-Dyne™  is  the  industry  standard  in  infrared  gas  catalytic  heaters,  enclosures, 

pipeline systems and accessories. Customers across a wide range of industries rely on 

Cata-Dyne™ to supply them with safe, reliable, efficient and versatile infrared catalytic 

heating  equipment  for  a  variety  of  applications  in  both  hazardous  and  non-hazardous 

environments.

Edmonton, AB 

Head Office

1-800-661-8529

(780) 466-3178

F 780-468-5904

Oakville, ON

1-800-410-3131

(905) 829-4422

F 905-829-4430

Orillia, ON

1-877-325-3473

(705) 325-3473

F 705-325-2106

Houston, TX

1-855-219-2101

(281) 506-2310

F 281-506-2316

Denver, CO

1-855-244-3128

(303) 979-7339

F 303-979-7350

Содержание Fastrax G Series

Страница 1: ...Installation Operations Manual G Series Control Panel Package...

Страница 2: ...Mast 16 Junction Box Installation Junction Box Placement 17 Direct Burial Cable Conduit Trenching 17 Direct Burial Cable Conduit Junction Box Installation 18 SwitchBlade Heater Installation SwitchBlad...

Страница 3: ...40 Extension Control Panel Wiring Diagram 2 No 9 10 Or 11 Switch Spring Frog Heating System 41 Extension Control Panel Wiring Diagram 1 No 14 15 Or 16 Switch Spring Frog Heating System 42 Extension C...

Страница 4: ...Power Operated Turnout with 2 Power Operated Movable Point Frog Hollow Metal Ties Master Control with Extension Panels Quantity Required Fastrax Part No Description 1 FCM4 Fastrax Master Control Panel...

Страница 5: ...ster Control Panel Maximum 4 Slaves FCM4 NONE Fastrax Master Control Panel Control maximum of 4 Extension panels of any size Minimum 10 Amp 120 Volt 1 phase required Enclosure size 36 H X 30 W X10 D P...

Страница 6: ...d panel installation are complete 2 Using a socket wrench remove lag bolts from the crate 3 Open the panel and check that the nameplate information matches the Bill of Material list 2 0 Control Panel...

Страница 7: ...stem Checkout sheet located at the back of the manual 4 0 Junction Box Assembly Ensure that each junction box has a corresponding support pedestal 5 0 Installation Accessories Unpack the installation...

Страница 8: ...d com www fastraxind com 8 B 2 SINGLE STAND ALONE SWITCH WITH FROG No 9 No 11 Switch and Frog No 14 No 16 Switch and Frog No 20 24 Switch and Frog TYPICAL OVERALL LAYOUT FOR SINGLE SWITCH WITH FROG NO...

Страница 9: ...nologies Inc 9 B 3 CROSSOVER NO 20 24 SWITCHES WITH FROGS Single Crossover No 20 or No 24 Switches with Frogs FA S T R A X R R R Double Crossover No 20 or No 24 Switches with Frogs FA S T R A X R R R...

Страница 10: ...d for general positioning of equipment only Review your company standards for exact equipment layout TYPICAL SYSTEM LAYOUT EQUIPMENT DETAIL NO 9 10 OR 11 STANDARD SWITCH SIZE ALL TIE STYLES Fastrax FJ...

Страница 11: ...equipment only Review your company standards for exact equipment layout TYPICAL SYSTEM LAYOUT EQUIPMENT DETAIL NO 14 15 or 16 STANDARD SWITCH SIZE ALL TIE STYLES Fastrax FJA or FJAM Junction Box Fast...

Страница 12: ...general positioning of equipment only Review your company standards for exact equipment layout TYPICAL SYSTEM LAYOUT EQUIPMENT DETAIL NO 20 24 STANDARD SWITCH SIZE ALL TIE STYLES Fastrax FJA or FJAM...

Страница 13: ...of Frog To Fastrax Control Panel Heel of Frog Fastrax Junction Box Fastrax SwitchBlade Heater Inserted in milled slot or clamped to D Bar of the Spring Rail Frog Movable Point Frog Heating Layout Typi...

Страница 14: ...op of the unistrut channels at the 11 mark Figure C 1 2 Control panel positioning 3 Slide one of the 3 8 channel nuts above and below the four control panel mounting holes Use one 3 8 x 1 1 2 bolt and...

Страница 15: ...ing conduit underground cables 2 0 If PVC Conduit is provided 1 Two 4 conduits are provided One conduit is for the direct burial conductors coming from the switch and frog junction boxes The other con...

Страница 16: ...n the back of the panel support channel 3 Locate mark and cut the preferred location for the 1 2 fitting to enter the bottom of the control panel 4 Using the 1 2 opening in the panel bottom install th...

Страница 17: ...unction Box Note Follow Railroad guidelines and specifications for trenching to prevent damage to existing buried lines Always locate and mark existing cables before digging 3 For the placement of the...

Страница 18: ...height of the junction box Figure D 1 7 Direct Burial Cable Junction Box Note For direct burial cables use the glands provided in the accessory kit to properly terminate the cable for entry into the j...

Страница 19: ...r heater to move freely 4 Mark the rail where clamps are to be installed Heaters should be clamped about every 2 ft A common rule of thumb is to clamp each heater in every crib space It is acceptable...

Страница 20: ...nt it from seating on the rail 3 The end of the clamp body will wrap around the gage side of the rail when seated properly 4 Tighten each clamp by turning the swivel screw with an Allen wrench until t...

Страница 21: ...ay the rear heater in place while feeding the dead end in from the heel block location Bring the dead end to about 2 from the dead end of the front heater 2 If necessary adjust both heaters to allow f...

Страница 22: ...fish tape if necessary 6 The heaters generally will have a piece of cold shrink strain relief rubber over the area where the wire enters the heater Slip the orange conduit as far as it will go over t...

Страница 23: ...on to confirm that the installed track switch appears as shown in Figure 3 Note Proper heater clearance must exist above the reinforcement bolts to allow for an unobstructed path for heater element to...

Страница 24: ...s have a rectangular channel manufactured into the base of the frog casting The channel is designed to extend from the frog heel to the toe and is open on each end Inspect your spring frog to see if i...

Страница 25: ...clamp right where the D bar reinforcement starts Mark the rest of the clamps at 24 intervals and place one final clamp at the end of the heater Remove heater from the frog 4 Drill blind holes 5 8 deep...

Страница 26: ...the MPF slide each wing rail SwitchBlade heater along the base of each wing rail through the slots provided in the braces Any non toxic lubricant may be used and it will evaporate once the heaters are...

Страница 27: ...heck the heater nameplate for proper voltage 3 Between conventional ties remove the ballast to allow 2 of clearance below the switch rods 4 For heating cribs with switch rods connecting to a switch ma...

Страница 28: ...the switch heater metal housing as well as the ground terminals of the primary arresters is essential for personnel protection as well as surge protection Grounding rods and conductors must be instal...

Страница 29: ...ter panel end of each conductor 4 Using the wiring diagram for guidance bend wires close to their connection point Strip the wire insulation and connect each wire as shown tight to the torque value sh...

Страница 30: ...diagram for your panel style in this section FAS1A sensors are only connected to master or stand alone panels 3 Leaving extra slack in the panel cut the sensor wire to comfortably reach their designa...

Страница 31: ...sion or stand alone panels 4 Leaving extra slack in the panel cut the sensor wire to comfortably reach their designated terminals Strip the insulation from each conductor leaving about 5 8 bare wire C...

Страница 32: ...traxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 32 H SYSTEM WIRING DIAGRAMS H 1 STAND ALONE CONTROL PANEL WIRING DIAGRAM 1 NO 9 10 OR 11 SWITCH SPRING FROG HEATING SYS...

Страница 33: ...CCI Thermal Technologies Inc 33 H 2 STAND ALONE CONTROL PANEL WIRING DIAGRAM 2 NO 9 10 OR 11 SWITCH SPRING FROG HEATING SYSTEM...

Страница 34: ...FastraxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 34 H 3 STAND ALONE CONTROL PANEL WIRING DIAGRAM 1 NO 14 15 OR 16 SWITCH SPRING FROG HEATING SYSTEM...

Страница 35: ...CCI Thermal Technologies Inc 35 H 4 STAND ALONE CONTROL PANEL WIRING DIAGRAM 1 NO 20 OR 24 SWITCH SPRING FROG HEATING SYSTEM...

Страница 36: ...FastraxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 36 H 5 STAND ALONE CONTROL PANEL WIRING DIAGRAM 1 NO 20 OR 24 SWITCH MOVABLE POINT FROG HEATING SYSTEM...

Страница 37: ...CCI Thermal Technologies Inc 37 H 6 MASTER CONTROL PANEL WIRING DIAGRAM UP TO 4 FASTRAX EXTENSION PANELS...

Страница 38: ...FastraxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 38 H 7 EXTENSION CONTROL PANEL WIRING DIAGRAM 1 NO 20 OR 24 SWITCH MOVABLE POINT FROG HEATING SYSTEM...

Страница 39: ...CCI Thermal Technologies Inc 39 H 8 MASTER CONTROL PANEL WIRING DIAGRAM UP TO 8 FASTRAX EXTENSION PANELS...

Страница 40: ...FastraxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 40...

Страница 41: ...CCI Thermal Technologies Inc 41 H 9 EXTENSION CONTROL PANEL WIRING DIAGRAM 1 NO 9 10 OR 11 SWITCH SPRING FROG HEATING SYSTEM...

Страница 42: ...FastraxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 42 H 10 EXTENSION CONTROL PANEL WIRING DIAGRAM 2 NO 9 10 OR 11 SWITCH SPRING FROG HEATING SYSTEM...

Страница 43: ...CCI Thermal Technologies Inc 43 H 11 EXTENSION CONTROL PANEL WIRING DIAGRAM 1 NO 14 15 OR 16 SWITCH SPRING FROG HEATING SYSTEM...

Страница 44: ...FastraxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 44 H 12 EXTENSION CONTROL PANEL WIRING DIAGRAM 1 NO 20 OR 24 SWITCH MOVABLE POINT FROG HEATING SYSTEM...

Страница 45: ...1 Side View of a Typical Junction Box Installation Figure H 13 2 Fastrax FC Insulated Connectors Used For Wire Connection In Junction Box Table H 13 1 Insulated Connector Torque Strip Chart Wire Size...

Страница 46: ...nduit Installation Breather Drain Installed 3 4 NPT For Fastrax FA375 PC Connector Entry For Rail Crib Spring Frog and or Crib Heaters For Movable Point Frog Typical Of 9 Figure H 14 1 Top View of Jun...

Страница 47: ...tchBlade Heater Figure H 14 3 No 20 or 24 SwitchBlade Heater Running Rail Connections Left and Right SwitchBlade Heaters At Rear Junction Box 7C 14 U G Cable From Stand Alone or Extension Panel Fastra...

Страница 48: ...om Stand Alone or Extension Panel 3C 12 Cable From SwitchBlade Heaters 750 Watts Each for Movable Point Frog Plate 2C 10 Cable From 2 SwitchBlade Heaters for Movable Point Frog Wing Rail Figure H 14 5...

Страница 49: ...nnector provided with the sensor connect the wires as shown in Figure H 15 2 Figure H 15 1 FGSP1A Ground Snow Sensor Figure H 15 2 FGSP1A Junction Box Wire Connections Table H 15 1 Wire Descriptions W...

Страница 50: ...OURS HOURS HOURS NOTES OPERATION CHECKOUT INSTRUCTIONS QUALIFIED PERSONNEL ONLY 2 PUSH GREEN START WAIT FOR PANEL TO ENERGIZE CHECK FULL POWER ON PILOT PUSH STOP 5 USING FREEZE SPRAY AND WATER TEST FA...

Страница 51: ...seconds the module will go into fault Check that the pilot light on dead front panel turned off Wait 8 10 seconds the GFI will reset Record ground fault test data below With dead front open turn disc...

Страница 52: ...breakers and turn panel on Full Power At master panel record main load Ground fault modules are factory set No adjustments necessary To view trip set point open plastic cover hinges up Push R button...

Страница 53: ...HM AMP VOLT NOTE NOTES FORM 0004ET TERMINAL NUMBERS 1 Position Facing switch point left or right hand heater PROJECT LOCATION HEATER CIRCUIT READINGS 2 Complete REF OHM column immediately before insta...

Страница 54: ...ation Of Heaters Common Parallel Circuit Readings HEATER COMBINATIONS WATTAGE OHMS AMPS OHMS AMPS OHMS AMPS 1 2 200W 1 4 600W 6 800 8 5 28 3 33 9 14 2 52 9 11 3 1 2 200W 1 5 800W 8 000 7 2 33 3 28 7 1...

Страница 55: ...full power is applied the green Full Power On indicating light will be illuminated 4 The integrated control and sensor system will continue to monitor the environment until no further snowfall is det...

Страница 56: ...to the off position Automatic control will not operate again until the disconnect is returned to the on position For normal automatic control leave disconnect in the on position I 4 ADDITIONAL FEATUR...

Страница 57: ...during the hold time operation either full or 25 power maintenance cycle if new snow falls and the ambient temperature falls below 38 F the automatic control is re initiated and full heating operation...

Страница 58: ...main off The system will continue to try and reset every 5 minutes until it resets or an operator repairs the damaged switch heater or associated wiring If the system is running multiple switches or f...

Страница 59: ...Dist Block Primary 120 Pwr Dist Block Secondary 45 Circuit Breakers Heater And Control Loads 17 7 STANDARD EQUIPMENT SELECTION I 10 SWITCHBLADE HEATING Contact Fastrax or review the bill of material f...

Страница 60: ...heaters automatically return to full output J 2 INSTALLATION PROCEDURE Note Do not operate heaters at voltages in excess of that stamped on the heater Excess voltage will shorten heater life 1 0 SWITC...

Страница 61: ...azard of severe shock Disconnect all power to heaters before servicing or replacing heaters Only qualified personnel trained in electrical equipment service should perform maintenance on switch heatin...

Страница 62: ...62 NOTES...

Страница 63: ...ficient heat transfer on rail equipment and components for the coldest environments In addition to heaters Fastrax manufactures fully automatic energy saving controls to complete the rail heating syst...

Отзывы: