A.4 EQUIPMENT CHECK
Note:
Notify your supervisor, purchasing department or
Fastrax
®
of any missing or damaged parts.
1.0
Control Panel:
1.
Using a Phillips screwdriver or Phillips driver head
and power drill, remove top and sides of panel crate.
Note:
Inside each stand alone or master control panel
crate there is one FAS1A Aerial Snow Sensor located
in a box. Keep the sensor in a safe place until the panel
support and panel installation are complete.
2.
Using a socket wrench, remove lag bolts from the
crate.
3.
Open the panel and check that the nameplate
information matches the Bill of Material list.
2.0
Control Panel Support:
1.
Using a Phillips screwdriver, remove top and sides of
panel support assembly crate.
2.
Ensure that each panel support size matches the
corresponding panel size.
3.0
Heating Equipment:
Figure A.4.1 - Typical Packaging
1.
Unpack each heater at the project site, prior to
installation.
2.
Ensure the correct voltage is marked on each heater
for your project.
3.
Ensure the part number on each heater matches the
Bill of Material for your project (refer to page 4 - A.2-1
Bill of Material and Figure A.2.2).
Содержание Fastrax G Series
Страница 1: ...Installation Operations Manual G Series Control Panel Package...
Страница 37: ...CCI Thermal Technologies Inc 37 H 6 MASTER CONTROL PANEL WIRING DIAGRAM UP TO 4 FASTRAX EXTENSION PANELS...
Страница 39: ...CCI Thermal Technologies Inc 39 H 8 MASTER CONTROL PANEL WIRING DIAGRAM UP TO 8 FASTRAX EXTENSION PANELS...
Страница 40: ...FastraxTM 1 855 244 3128 Fax 1 303 979 7350 sales fastraxind com www fastraxind com 40...
Страница 62: ...62 NOTES...