![ccei PF10J025 Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/ccei/pf10j025/pf10j025_technical-manual_2575775014.webp)
PHENIX
Technical Manual
v2.0
CCEI
page 14
The power supply must be permanent and properly protected against any possible
overvoltage and overloads.
Installing your PHENIX with a CCEI ZELIA ZLT chlorinator:
Cut the control cable supplied with the PHENIX so you have 2 cables with 1 connector
on one side, 2 wires on the other;
Connect the flow detector (optional, ref. KT200006) to the “Flow detector” input of the
PHENIX (under the cabinet on the left) using one of the two cables obtained above,
Connect the control output of the PHENIX (under the cabinet on the right) to the
“RedOx Control” input of the ZELIA ZLT control cabinet using the second cable;
The ZELIA ZLT must be used in ‘PA’ mode (Regulated Production) to
function with the PHENIX.
The power supply must be permanent and properly protected against any possible
overvoltage and overloads.
Flow detector (option
KT200006
Control cable supplied with the Phenix (cut
into 2 identical parts: one for the input and
the other for the output