INSTALLATION MANUAL
V1.3EN
BLEU
TITANE
RT
I
-EZ
CCEI
p
7
OPERATION AND MAINTENANCE OF THE HEATER
After the installation of the heater, it is imperative to verify that no leaks exist.
Installer must also ensure that connections of cables are correct (loose cable will
cause heating of the junction).
Before starting the heater, one must ensure that the pipe of the heater is full of water:
Do not put the heater on when it may contain ice. Similarly, we must ensure that the
circuit does not contain air.
Before the first start
- Ensure that the heater starts when increasing the set temperature (beyond the
current temperature) and that water flows through the heater. The green light
should illuminate.
- Ensure that the heater stops when stopping filtration.
- Replace the filter on and make sure that the heater stops when you decrease
the set temperature.
WINTERAGE MANAGEMENT
During the winter, switch off the heater and to drain the heater pipe.
At the restart, check the electric connections, tighten the pipe unions and the flow
switch screw.