Page 11 of 40
5.0 OPERATING PROCEDURE
IT IS IMPERATIVE THAT ALL PERSONS USING, OPERATING OR
MAINTAINING THIS CABLE BLOWING MACHINE:
HAVE RECEIVED COMPREHENSIVE TRAINING IN THE USE OF
THIS MACHINE.
ARE COMPETENT TO USE IT,
AUTHORISED TO USE IT AND
HAVE READ AND UNDERSTOOD THIS MANUAL
CBS PRODUCTS LTD. CANNOT BE HELD RESPONSIBLE FOR
MISUSE OF THIS EQUIPMENT.
Set up for installing cable with the machine mounted above ground:
Position the machine in line with the route of the duct.
Position the cable drum behind the machine and in line with the machine. See sketch
below (this shows a plan view of the recommended set up).
Ensure the machine is secure (either on its own stand or a separate suitable stand).
Ensure the machine is fitted with the appropriate guides and collets to suit the cable
being installed and tubes into which the cable is to be installed. (See Appendix 1 for
details of interchangeable parts).
To set the machine up to install cable it will be necessary to:
Select the appropriate Torque setting for the cable being installed, if in doubt start with
the low torque setting.
Fit the tube into which the cable is to be installed into the air box and tube clamp.
Fit the cable through the machine.
Connect the air supply to the machine.
Connect the electrical power input to the machine.
Breeze machine
Tube route
Cable drum