CANplus
TM
CP1000
Installation Manual
11
9M01-1000-A401-EN
Revision B
5
Testing
WARNING
DURING THE FOLLOWING PROCEDURE, CORRECT ANY PROBLEMS BEFORE PROCEEDING
TO THE NEXT STEP. CONTINUED TESTING MAY DAMAGE THE PANEL, HARNESS OR ENGINE.
Use the following testing procedure:
1. Turning the keyswitch ON initiates self-test; check all connections and battery polarity on failure.
2. Test to verify overcurrent protection; identify and correct any wiring fault on failure.
3. Verify fuel run/stop solenoid or ECM energizes.
4. Fuel solenoid should be powered for 10 to 30 seconds when the key is turned on.
a.
The ECM should send CAN bus data as soon as the self-test completes.
b.
Verify engine cranks when the key is turned to start; check all connections on failure.
5. If the engine does not start, check the fuel lines and bleed if necessary.
6. Verify gauges and indicators with the engine running.
a. See the CP1000 User Manual for details.
7. Test all safety shutdowns.
a. See the CP1000 User Manual for details.
8. Run the engine for an extended time to identify any temperature or connection problems.
!