background image

SETTING THE VERTICAL CLAMPS

(OPTION)

After releasing the handle (M2), position the vertical clamp positioning arms (BP) according to
the profile and the width of the moulding.
Apply the clamps by lifting your foot from the pedal, checking that the clamp pressor does not tilt
the moulding. The back of the moulding must be flat against the stops and its base on the work
table. To guarantee high quality cutting and safe operating conditions the moulding must be
immobilised throughout the operation.

Repeat the test under the same conditions for the right clamp. 

The measurement obtained

after setting the left vertical clamp can be set on the rule of the right vertical clamp.

M2

BP

MEASURE

MEASURE

LEFT VERTICAL CLAMP

RIGHT VERTICAL CLAMP

1 st CUT ( preparing the moulding )

The moulding must have a fresh mitre cut before starting the measuring operations.

IMPORTANT:

When the cut is made, the right  clamp must always be in contact with the

bottom of the slot  and never press against the cut part of the moulding.  If the latter is the
case, loosen the handle of the right horizontal clamp and move it back. Only the left hori-
zontal clamp will be used for clamping.

Once setting of the horizontal and vertical (option) clamps is complete:

- Unlock button 5.
- Lift your foot from the pedal.
- Press button 4 on the control panel (to start the blades).
- Press button 2 continuously with a finger of your right hand. This releases the left blade.
- Grip the arm of the left blade carriage with your left hand and pull the blade slowly

towards the clamped profile. Make the cut through to the front stop.

- Release button 2 and the blade carriage arm (which will return automatically to the back

position).

- Press button 5 to stop the machine.
- Press the pedal: the clamps move to unclamped position.
- Slide the moulding, pushing it from the left table to the right table.

1

2

3

4

5

8

Содержание CS 960

Страница 1: ...CS 960 Cassese Communication Z15768 Manual Operated Double Mitre Saw 45 Instructions for Use Technical Data VERSION 2 09 2005...

Страница 2: ...ft horizontal clamp Left horizontal clamp handle Machine identity plate LEFT SIDE OF MACHINE Electrical contactor RIGHT SIDE OF MACHINE Air supply Right vertical clamp handle Right vertical clamp opti...

Страница 3: ...kW Extraction nozzle ext dia 2x100 mm Extraction compliant with standards 28 m3 s at 4 m for 100 Air supply 4 bar min 4 to 6 bar Max consumption 2 3l cycle Weight 950 kg 58 710 Kg 57 Noise compulsory...

Страница 4: ...C...

Страница 5: ...st extraction 6 IV START UP Control panel 6 7 V SAWING Horizontal clamp setting 7 Vertical clamp setting 8 First cut on the left 8 Measuring the first piece 9 Cutting the first piece 10 VI PREVENTIVE...

Страница 6: ...ade carriage ensures operator safety by keeping hands out of range of the blades The electrical control equipment is installed in a cabinet at the front of the machine The pneumatic equipment is insta...

Страница 7: ...G Using a screwdriver open the crate fasteners then remove the lid and 4 sides Leaving the protection in place remove 1 the accessories box the left and right blade carriage arms and the left table ex...

Страница 8: ...iel de levage Horquillas del equipo de elevaci n Forks of the lifting equipment Once the machine is installed removed the protection Open the removable panel at the rear of the machine after removing...

Страница 9: ...after adjustment and levelling As the work surface is 900 mm from the floor it may be necessary to have a platform available for operator of short stature B CE Assembling the left and right tables Ope...

Страница 10: ...2 rule supports until it is stopped by screws R and B Screw the extension to the frame at A and B using screws A and B Secure the cylindrical support of the bracket using screw F Tighten screws 1 2 3...

Страница 11: ...Source characteristics dry non lubricated air Electrical connection The user must connect the power supply cable to a source complying with the regulations in force and protect the machine by fitting...

Страница 12: ...move to UNCLAMPING position Keep the pedal pressed with your foot throughout setting Release the left clamp handle M and move the pressor to roughly 1 cm from the profile edge then retighten handle M...

Страница 13: ...ing the measuring operations IMPORTANT When the cut is made the right clamp must always be in contact with the bottom of the slot and never press against the cut part of the moulding If the latter is...

Страница 14: ...ng screw Press the pedal to release the clamps Move the moulding to the cursor aligning the edge of the slot base with the 45 angle MEASURING THE OUTSIDE DIMENSION CURSOR RULE LOCKING SCREW READING PO...

Страница 15: ...lease the piece of cut moulding from the right hand side Slide the moulding pushing it from the left table towards the right table END OF MOULDING Clamping and cutting are visible to the operator He m...

Страница 16: ...main isolating switch Lock the main case by screwing the cover safety screw fully home REFITTING THE BLADES IMPORTANT REMOVING THE BLADES Disconnect the air supply Switch off the machine at the main...

Страница 17: ...g hours a day Cleaning Clean the plexiglass screen with a soft cloth Clean the offcut outlet hopper Belt inspection Every 3 months Blade sharpening Cutting quality depends on the sharpness of the blad...

Отзывы: