– 59 –
No
Operation
Display
Inspection contents
9
10
No.16 IrDA (3/3)
Confirm the display on the left.
Set IT3000 on HA-B61IO, and
execute "flce".
Start
_
> Programs
_
>
Communication
_
> FLCE
Screen of IT-3000
Tap "OK"
or
push "Enter" key.
Confirm the display on the left.
Inspection is completed when
the "flce" execution display on
IT-3000 is disappeared.
Computer display
Note
Since a test file “TEST.DAT” is generated in “My Computer” folder on the test object IT-3000, delete it together
with the Recycle Bin folder or remove the battery for more than 10 minutes after the inspection.
Содержание IT-3100
Страница 1: ...SERVICE MANUAL HANDHELD TERMINAL IT 3100 Series PX 780 JUL 2008 Ver 4 Feb 2011...
Страница 14: ...12 3 4 COMPONENTS LOCATION ON THE MAIN PCB...
Страница 15: ...13...
Страница 90: ...88 UPPER CASE PW FPC KEY FPC 1 2 3 5 6 1 4 6 2 6 1 1 2 1 3 1 1 4 7 9 8 8 8 111 113 114 112 9 2 9 1...
Страница 93: ...91 ROLL PAPER HOLDER 48 8 48 8 48 2 48 4 48 5 48 1 48 3 48 6 48 7 48 9 48...