Auxiliary foot control
In neutral the auxiliary foot control is a closed center hydraulic valve. The inlet oil from the pilot pump is blocked at
both regulator spools (12). The ports (1), (2), are ported inside of the valve back to tank through a hole drilled in
the end, and a cross drilled hole in the regulator spool (12).
There are two springs (16) and (15) for each regulator spool (12). The larger diameter spring (16) provides the
return of the foot pedal and this spring (15) is the resistance the operator feels in his foot.
Typically the return springs are stronger in foot control than in hand control.
If the dust cover (23) under the foot control is torn, replace it. This will help prevent contamination from wearing
the U-seals (6) on the push rods (8).
The gap between the push rod (8) and the screw (21) can be adjusted. A too tight adjustment can cause partial
actuation of the spool. The contact area between the push rod (8) and the screw (21) should be lightly lubricated
with grease.
How it work
As the foot control is moved, the push rod (8) will push on both large and small diameter springs 16 & 15). The
smaller spring (15) will push the spool (12) and block of the return passage through the top metering notches.
The bottom metering land will open a passage and allow pilot oil out to the work spool of the travel control spool.
As the travel spool moves and compresses the spring in the control valve, the pressure will increase and push up
on the bottom of the regulator spool (12. When the pressure of the oil pushing on the travel spool equals the force
of the spring (15) behind the regulator spool (12) the bottom metering land will block the pilot supply. When the
force of the spring (15) equals the force of the pressure on the spool (12), the spool (12) is in a balanced position
to maintain a proportional pressure with the compression of the spring (15).
The foot control must be moved further to compress the small spring (15) and push the regulator spool (12)
further to increase the pressure again.
The foot control is nothing more than an adjustable pressure regulator, and the operator provides adjustment .
1 Body
2.Mounting braket
3.Seal bushing
4.Seal kit
5.U-seal
6.Wipper seal
7.O-ring
8.Push rod
9.Washer
10.Spring guide
11.Spring guide
12.Snap ring
13.Spring cup
14.Spring retainer
15.Regulator spring
16.Feel back spring
17.Bushing
18.Pin
19.Cam
20.Screw
21.Ajustment bolt
22.Nut
23.Rubber boot
Содержание CX130
Страница 1: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000...
Страница 2: ......
Страница 3: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 1 GENERALE INTRODUCTION...
Страница 4: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 24: ......
Страница 25: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 2 COMPONENTS LAYOUT...
Страница 26: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 33: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 3 COMPONENTS...
Страница 34: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 37: ...COMPONENTS CX130 3 3 CASE TRAINING CENTER AUGUST 2000 Hand remote control...
Страница 39: ...COMPONENTS CX130 3 5 CASE TRAINING CENTER AUGUST 2000 Foot control...
Страница 41: ...COMPONENTS CX130 3 7 CASE TRAINING CENTER AUGUST 2000 Auxiliary foot control...
Страница 53: ...COMPONENTS CX130 3 19 CASE TRAINING CENTER AUGUST 2000 Pump...
Страница 54: ...3 20 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Страница 55: ...COMPONENTS CX130 3 21 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Страница 56: ...3 22 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump control block follow...
Страница 57: ...COMPONENTS CX130 3 23 CASE TRAINING CENTER AUGUST 2000 Pump control block...
Страница 58: ...3 24 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Страница 59: ...COMPONENTS CX130 3 25 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Страница 60: ...3 26 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Страница 61: ...COMPONENTS CX130 3 27 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Страница 62: ...3 28 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Страница 63: ...COMPONENTS CX130 3 29 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Страница 68: ...3 34 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Boom savety valve H B C V...
Страница 69: ...COMPONENTS CX130 3 35 CASE TRAINING CENTER AUGUST 2000 Dipper arm savety valve H B C V...
Страница 71: ...COMPONENTS CX130 3 37 CASE TRAINING CENTER AUGUST 2000...
Страница 73: ...COMPONENTS CX130 3 39 CASE TRAINING CENTER AUGUST 2000...
Страница 74: ...3 40 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Страница 75: ...COMPONENTS CX130 3 41 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Страница 76: ...3 42 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Страница 77: ...COMPONENTS CX130 3 43 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Страница 78: ...3 44 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Страница 79: ...COMPONENTS CX130 3 45 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Страница 80: ...3 46 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Страница 81: ...COMPONENTS CX130 3 47 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Страница 82: ...3 48 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Страница 83: ...COMPONENTS CX130 3 49 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Страница 84: ...3 50 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Flow restrictor...
Страница 85: ...COMPONENTS CX130 3 51 CASE TRAINING CENTER AUGUST 2000 Boom cylinder...
Страница 87: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 4 DIAGNOSTIC MODEL SELECTION...
Страница 88: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 103: ...DIAGNOSTIC SELECTION 4 15 CASE TRAINING CENTER AUGUST 2000...
Страница 141: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 5 ELECTRICAL...
Страница 142: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 143: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 190: ......
Страница 191: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 6 HYDRAULIC CIRCUIT...
Страница 192: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 193: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 215: ...HYDRAULIC CIRCUIT 6 22 CASE TRAINING CENTER AUGUST 2000...
Страница 218: ...6 25 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 OPTION CIRCUITS Hammer option Double acting option...
Страница 219: ...HYDRAULIC CIRCUIT 6 26 CASE TRAINING CENTER AUGUST 2000 Clamshell option Multipurpose option...
Страница 220: ...6 27 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 2nd auxiliary circuit option Hammer and 2nd auxiliary option...
Страница 222: ...6 29 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 Clamshell and 2nd auxiliary and multipurpose option...
Страница 223: ...HYDRAULIC CIRCUIT 6 30 CASE TRAINING CENTER AUGUST 2000 PUMP CX 130 Pump engine stopped...
Страница 234: ......
Страница 235: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 7 SETTINGS...
Страница 236: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 260: ......