DIAGNOSTIC - SELECTION
4 - 25
CASE TRAINING CENTER
AUGUST 2000
Fuel
Description of the problem No. 1
- The message is still displayed even after refilling the fuel tank.
1.
Main electronic control box
2.
Fuel level sender
Resistance between GL and BG
Troubleshooting
Cause
Action
Starter key switch ON
Measure the
resistance of the fuel
level sender using
maintenance support
CHK4. (Refer to the
table below for the
resistance).
YES
Defective
main
electronic
control box
Change the
main
electronic
control box
NO
Starter key switch OFF
Disconnect the coupler
from the fuel level
sender to measure the
resistance of the
coupler at the fuel level
sender end. (Refer to
the table below for the
resistance).
NO
Defective fuel
level sender
Change or
check the
fuel level
sender
YES
Disconnect the CN24
connector to measure
the resistance between
GL female and the GND
earth. (Refer to the
table below for the
resistance).
NO
Bad
connection on
fuel level
sender
Clean the
connection
terminal
YES
Disconnect connector
CN1 to measure the
resistance between
female GL and the GND
earth. (Refer to the
table below for the
resistance).
NO
Bad
connection on
CN24
Clean CN24
connection
terminal
YES
Defective
main
electronic
control box or
incorrect CN1
connection
Change the
main
electronic
control box
or clean the
CN1
connection
terminal
Note: All the bar graph indicators have disappeared when the circuit is open
Monitor
1. Refill the tank
2
3
4
5
6
7
8
Resistance (OHM)
80-75
75-61
61-47
47-37
37-30
30-24
24-19
19-10
1
2
Содержание CX130
Страница 1: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000...
Страница 2: ......
Страница 3: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 1 GENERALE INTRODUCTION...
Страница 4: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 24: ......
Страница 25: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 2 COMPONENTS LAYOUT...
Страница 26: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 33: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 3 COMPONENTS...
Страница 34: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 37: ...COMPONENTS CX130 3 3 CASE TRAINING CENTER AUGUST 2000 Hand remote control...
Страница 39: ...COMPONENTS CX130 3 5 CASE TRAINING CENTER AUGUST 2000 Foot control...
Страница 41: ...COMPONENTS CX130 3 7 CASE TRAINING CENTER AUGUST 2000 Auxiliary foot control...
Страница 53: ...COMPONENTS CX130 3 19 CASE TRAINING CENTER AUGUST 2000 Pump...
Страница 54: ...3 20 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Страница 55: ...COMPONENTS CX130 3 21 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Страница 56: ...3 22 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump control block follow...
Страница 57: ...COMPONENTS CX130 3 23 CASE TRAINING CENTER AUGUST 2000 Pump control block...
Страница 58: ...3 24 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Страница 59: ...COMPONENTS CX130 3 25 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Страница 60: ...3 26 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Страница 61: ...COMPONENTS CX130 3 27 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Страница 62: ...3 28 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Страница 63: ...COMPONENTS CX130 3 29 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Страница 68: ...3 34 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Boom savety valve H B C V...
Страница 69: ...COMPONENTS CX130 3 35 CASE TRAINING CENTER AUGUST 2000 Dipper arm savety valve H B C V...
Страница 71: ...COMPONENTS CX130 3 37 CASE TRAINING CENTER AUGUST 2000...
Страница 73: ...COMPONENTS CX130 3 39 CASE TRAINING CENTER AUGUST 2000...
Страница 74: ...3 40 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Страница 75: ...COMPONENTS CX130 3 41 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Страница 76: ...3 42 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Страница 77: ...COMPONENTS CX130 3 43 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Страница 78: ...3 44 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Страница 79: ...COMPONENTS CX130 3 45 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Страница 80: ...3 46 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Страница 81: ...COMPONENTS CX130 3 47 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Страница 82: ...3 48 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Страница 83: ...COMPONENTS CX130 3 49 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Страница 84: ...3 50 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Flow restrictor...
Страница 85: ...COMPONENTS CX130 3 51 CASE TRAINING CENTER AUGUST 2000 Boom cylinder...
Страница 87: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 4 DIAGNOSTIC MODEL SELECTION...
Страница 88: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 103: ...DIAGNOSTIC SELECTION 4 15 CASE TRAINING CENTER AUGUST 2000...
Страница 141: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 5 ELECTRICAL...
Страница 142: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 143: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 190: ......
Страница 191: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 6 HYDRAULIC CIRCUIT...
Страница 192: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 193: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 215: ...HYDRAULIC CIRCUIT 6 22 CASE TRAINING CENTER AUGUST 2000...
Страница 218: ...6 25 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 OPTION CIRCUITS Hammer option Double acting option...
Страница 219: ...HYDRAULIC CIRCUIT 6 26 CASE TRAINING CENTER AUGUST 2000 Clamshell option Multipurpose option...
Страница 220: ...6 27 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 2nd auxiliary circuit option Hammer and 2nd auxiliary option...
Страница 222: ...6 29 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 Clamshell and 2nd auxiliary and multipurpose option...
Страница 223: ...HYDRAULIC CIRCUIT 6 30 CASE TRAINING CENTER AUGUST 2000 PUMP CX 130 Pump engine stopped...
Страница 234: ......
Страница 235: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 7 SETTINGS...
Страница 236: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 260: ......