HYDRAULIC PRESSURE SETTINGS
7 - 15
CASE TRAINING CENTER
AUGUST 2000
Adjustment
CI00E508
1.
Loosen the lock nut (1) and turn the adjusting
screw (2) of the valve concerned until the correct
pressure is reached.
2.
Tighten the lock nut (1) while holding the adjusting
screw (2) in position.
3.
When the adjusting screw has been tightened,
check the pressure again and make sure there are
no leaks.
4.
Reset the secondary relief valve (A) to its original
pressure (refer to "Setting the standard
pressure").
Swing secondary relief valves
(I, J)
Test
CD00E143
1.
Disconnect the swing cancellation solenoid valve
connector (green).
2.
Display the diagnostic screen "CHK1".
3.
Start the engine and select the "S" mode.
4.
Operate the swing brake control on the instrument
panel (indicator lamp ON).
5.
Slowly operate the swing lever to the right, then
gradually increase engine speed to full speed to
ensure that the swing is locked.
6.
Repeat Step 5 for the LH swing, the pressures
should be:
Note the pressures if they are not correct to find the
number of shims needed for adjustment.
One 0.1 mm
shim corresponds to 5 bars of pressure
.
Function
CX130
Boom raising
P1
383±5 bar
(38.3±0.5 MPa)
Boom lowering
P1
383±5 bar
(38.3±0.5 MPa)
Dipper
retracting
P2
383±5 bar
(38.3±0.5 MPa)
Dipper
extending
P2
383±5 bar
(38.3±0.5 MPa)
Bucket opening
P1
383±5 bar
(38.3±0.5 MPa)
Bucket closing
P1
383±5 bar
(38.3±0.5 MPa)
1
2
Function
CX130
RH swing
P2
279±4 bar
(27.9±0.4 MPa)
LH swing
P2
279±4 bar
(27.9±0.4 MPa)
Содержание CX130
Страница 1: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000...
Страница 2: ......
Страница 3: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 1 GENERALE INTRODUCTION...
Страница 4: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 24: ......
Страница 25: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 2 COMPONENTS LAYOUT...
Страница 26: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 33: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 3 COMPONENTS...
Страница 34: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 37: ...COMPONENTS CX130 3 3 CASE TRAINING CENTER AUGUST 2000 Hand remote control...
Страница 39: ...COMPONENTS CX130 3 5 CASE TRAINING CENTER AUGUST 2000 Foot control...
Страница 41: ...COMPONENTS CX130 3 7 CASE TRAINING CENTER AUGUST 2000 Auxiliary foot control...
Страница 53: ...COMPONENTS CX130 3 19 CASE TRAINING CENTER AUGUST 2000 Pump...
Страница 54: ...3 20 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Страница 55: ...COMPONENTS CX130 3 21 CASE TRAINING CENTER AUGUST 2000 Pump follow...
Страница 56: ...3 22 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump control block follow...
Страница 57: ...COMPONENTS CX130 3 23 CASE TRAINING CENTER AUGUST 2000 Pump control block...
Страница 58: ...3 24 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Страница 59: ...COMPONENTS CX130 3 25 CASE TRAINING CENTER AUGUST 2000 Pump rotating group assembly follow...
Страница 60: ...3 26 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Страница 61: ...COMPONENTS CX130 3 27 CASE TRAINING CENTER AUGUST 2000 Pilot pressure pump...
Страница 62: ...3 28 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Страница 63: ...COMPONENTS CX130 3 29 CASE TRAINING CENTER AUGUST 2000 Proportional solenoid valve...
Страница 68: ...3 34 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Boom savety valve H B C V...
Страница 69: ...COMPONENTS CX130 3 35 CASE TRAINING CENTER AUGUST 2000 Dipper arm savety valve H B C V...
Страница 71: ...COMPONENTS CX130 3 37 CASE TRAINING CENTER AUGUST 2000...
Страница 73: ...COMPONENTS CX130 3 39 CASE TRAINING CENTER AUGUST 2000...
Страница 74: ...3 40 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Страница 75: ...COMPONENTS CX130 3 41 CASE TRAINING CENTER AUGUST 2000 Dual flow valve...
Страница 76: ...3 42 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Страница 77: ...COMPONENTS CX130 3 43 CASE TRAINING CENTER AUGUST 2000 Swing motor...
Страница 78: ...3 44 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Страница 79: ...COMPONENTS CX130 3 45 CASE TRAINING CENTER AUGUST 2000 Travel motor...
Страница 80: ...3 46 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Страница 81: ...COMPONENTS CX130 3 47 CASE TRAINING CENTER AUGUST 2000 Travel motor follow...
Страница 82: ...3 48 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Страница 83: ...COMPONENTS CX130 3 49 CASE TRAINING CENTER AUGUST 2000 Swivel joint...
Страница 84: ...3 50 COMPONENTS CX130 CASE TRAINING CENTER AUGUST 2000 Flow restrictor...
Страница 85: ...COMPONENTS CX130 3 51 CASE TRAINING CENTER AUGUST 2000 Boom cylinder...
Страница 87: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 4 DIAGNOSTIC MODEL SELECTION...
Страница 88: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 103: ...DIAGNOSTIC SELECTION 4 15 CASE TRAINING CENTER AUGUST 2000...
Страница 141: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 5 ELECTRICAL...
Страница 142: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 143: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 190: ......
Страница 191: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 6 HYDRAULIC CIRCUIT...
Страница 192: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 193: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 215: ...HYDRAULIC CIRCUIT 6 22 CASE TRAINING CENTER AUGUST 2000...
Страница 218: ...6 25 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 OPTION CIRCUITS Hammer option Double acting option...
Страница 219: ...HYDRAULIC CIRCUIT 6 26 CASE TRAINING CENTER AUGUST 2000 Clamshell option Multipurpose option...
Страница 220: ...6 27 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 2nd auxiliary circuit option Hammer and 2nd auxiliary option...
Страница 222: ...6 29 HYDRAULIC CIRCUIT CASE TRAINING CENTER AUGUST 2000 Clamshell and 2nd auxiliary and multipurpose option...
Страница 223: ...HYDRAULIC CIRCUIT 6 30 CASE TRAINING CENTER AUGUST 2000 PUMP CX 130 Pump engine stopped...
Страница 234: ......
Страница 235: ...HYDRAULIC EXCAVATOR CX130 CASE TRAINING CENTRE AUGUST 2000 SECTION N 7 SETTINGS...
Страница 236: ...CENTRE DE FORMATION CASE EDITION AOUT 2000...
Страница 260: ......