![Case IH 84336239 Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/case-ih/84336239/84336239_operators-manual_2567504071.webp)
SECTION 2 - CONTROLS, INSTRUMENTS AND OPERATION
2ï13
M12 = 75 Nm (53 lbs ft)
M14 = 120 Nm (85 lbs ft)
LEVELLING THE BALER
The neck of tongue (1) can be adjusted in various
positions with respect to the drawbar frame (2).
With the vehicle supported, as necessary secure the
neck in one of these positions, in order to have the
twine boxes as horizontal as possible.
After conversion, tighten the bolts to 304 - 335 Nm
(224 - 247 Ft lbs) torque.
20
Position of the mid-ship bearing
IMPORTANT: Any change to hitch height may require a
change also to the PTO driveline midship bearing to
maintain optimum alignment as possible between tractor
and baler.
The mid
‐
ship bearing mount (1) is fitted to the saddle
in the drawbar frame (2) using the mounting bolts (3).
After conversion, tighten the bolts to 97 Nm (71 lb ft).
21
Содержание 84336239
Страница 33: ...Table of Contents xxvii ...
Страница 34: ......
Страница 84: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï26 One next to the service ladder 43 ...
Страница 86: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï28 46 ...
Страница 91: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï33 MONITORS 55 56 57 58 ...
Страница 134: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï76 FIELD SETTINGS 163 164 165 166 ...
Страница 137: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï79 MEMORY 169 170 171 172 ...
Страница 166: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï108 Knotter 230 231 232 233 ...
Страница 177: ...SECTION 2 CONTROLS INSTRUMENTS AND OPERATION 2ï119 NOTE ...
Страница 178: ......
Страница 179: ......