
6 - MAINTENANCE
Grease points (Boom and arm)
Grease the boom, the arm and the swing system every
50 h
.
Lubricant:
CASE AKCELA MOLY GREASE
SMIL16MEX0420FA
1
Boom connection pin: two grease fittings
Boom cylinder (head and rod side): two grease fittings
Arm cylinder pin (head and rod side): two grease fittings
Boom and arm connection pin: one grease fitting
Boom swing cylinder (head and rod side): two grease
fittings
Lubrication manifold at upper frame: three grease fit-
tings
NOTICE:
if you operate the machine in water or mud, you
must lubricate the boom, the arm and the swing system
every
10 h
.
6-25
Содержание CX37C
Страница 16: ...1 GENERAL INFORMATION 1 10...
Страница 64: ...3 CONTROLS AND INSTRUMENTS Footrest SMIL16MEX1264BA 17 3 12...
Страница 136: ...5 TRANSPORT OPERATIONS 5 8...
Страница 200: ...6 MAINTENANCE 6 64...
Страница 204: ...7 TROUBLESHOOTING 7 4...
Страница 207: ...8 SPECIFICATIONS Number of rollers and shoes on each side Upper roller 1 Lower roller 4 Track shoes 44 8 3...
Страница 212: ...8 SPECIFICATIONS 8 8...