26
5. Connect the flexible tube on the sampling inlet to the sam-
pling tube on the basepan.
6. For units with an economizer, the sampling tube is inte-
grated into the economizer housing but connecting the
flexible tubing to the sampling tube is the same.
Fig. 54 — Return Air Smoke Detector Module
Shipping Position
Fig. 55 — Return Air Sensor Operating Position
FIOP Smoke Detector Wiring and Response
ALL UNITS
The FIOP smoke detector is configured to automatically shut
down all unit operations when a smoke condition is detected.
See Fig. 56, Smoke Detector Wiring.
HIGHLIGHT A
JMP 3 is factory-cut, transferring unit control to smoke detector.
HIGHLIGHT B
Smoke detector NC contact set will open on smoke alarm con-
dition, de-energizing the ORN conductor.
HIGHLIGHT C
24-v power signal using the ORN lead is removed at the smoke
detector input on CTB; all unit operations cease immediately.
PREMIERLINK™ AND RTU-OPEN CONTROLS
Unit operating functions (fan, cooling and heating) are termi-
nated as described above. In addition:
HIGHLIGHT D
On smoke alarm condition, the smoke detector NO Alarm con-
tact will close, supplying 24-v power to GRA conductor.
HIGHLIGHT E
GRA lead at Smoke Alarm input on CTB provides 24-v signal
to FIOP DDC control.
PREMIERLINK
This signal is conveyed to PremierLink FIOP’s TB1 at terminal
TB1-6 (BLU lead). This signal initiates the FSD sequence by
the PremierLink control. FSD status is reported to connected
CCN network.
RTU-OPEN
The 24-v signal is conveyed to RTU-OPEN-J1-10 input termi-
nal. This signal initiates the FSD sequence by the RTU-OPEN
control. FSD status is reported to connected BAS network.
USING REMOTE LOGIC
Five conductors are provided for field use (see Highlight F in
Fig. 56) for additional annunciation functions.
ADDITIONAL APPLICATION DATA
Refer to
Factory-Installed Smoke Detectors for Small and Me-
dium Rooftop Units 2 to 25 Tons
for discussions on additional
control features of these smoke detectors including multiple
unit coordination. See Fig. 56.
SENSOR AND CONTROLLER TESTS
Sensor Alarm Test
The sensor alarm test checks a sensor’s ability to signal an
alarm state. This test requires the use of a field provided SD-
MAG test magnet.
SENSOR ALARM TEST PROCEDURE
1. Hold the test magnet where indicated on the side of the
sensor housing for seven seconds.
2. Verify that the sensor’s Alarm LED turns on.
3. Reset the sensor by holding the test magnet against the
sensor housing for two seconds.
4. Verify that the sensor’s Alarm LED turns off.
Controller Alarm Test
The controller alarm test checks the controller’s ability to initi-
ate and indicate an alarm state.
CONTROLLER ALARM TEST PROCEDURE
1. Press the controller’s test/reset switch for seven seconds.
2. Verify that the controller’s Alarm LED turns on.
3. Reset the sensor by pressing the test/reset switch for two
seconds.
4. Verify that the controller’s Alarm LED turns off.
SAMPLE TUBE
SCREWS
FLEXIBLE EXHAUST
TUBES
RETURN AIR SENSOR
(Operating Position Shown)
SCREWS (2)
SAMPLE TUBE
CONTROLLER
MODULE
IMPORTANT: Failure to follow this ALERT can result
in an unnecessary evacuation of the facility.
This test places the duct detector into the alarm state.
Unless part of the test, disconnect all auxiliary equipment
from the controller before performing the test. If the duct
detector is connected to a fire alarm system, notify the
proper authorities before performing the test.
Содержание WeatherMaster 50HC04
Страница 32: ...32 Fig 63 RTU Open Overlay for Economizer Wiring ...
Страница 33: ...33 Fig 64 VFD Overlay for W2770 Controller Wiring ...
Страница 85: ...85 Fig B 50HC A04 A06 PAC Control Diagram 208 1 60 208 230 3 60 460 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 86: ...86 Fig C 50HC A07 PAC Control Diagram 208 230 3 60 460 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 89: ...89 Fig F 50HC D08 D09 PAC Control Diagram 208 230 3 60 460 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 90: ...90 Fig G 50HC D11 PAC Control Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 91: ...91 Fig H 50HC D12 PAC Control Diagram 208 230 3 60 460 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 92: ...92 Fig I 50HC D14 PAC Control Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 93: ...93 Fig J 50HC A04 A06 PAC Power Diagram 208 230 1 60 APPENDIX D WIRING DIAGRAMS ...
Страница 94: ...94 Fig K 50HC A04 A06 PAC Power Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 95: ...95 Fig L 50HC A07 PAC Power Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 98: ...98 Fig O 50HC D07 PAC Power Diagram 575 3 60 6 Ton 2 Stage with Dehumidification APPENDIX D WIRING DIAGRAMS ...
Страница 99: ...99 Fig P 50HC D08 D09 PAC Power Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 100: ...100 Fig Q 50HC D11 PAC Power Diagram 208 230 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 101: ...101 Fig R 50HC D11 PAC Power Diagram 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 102: ...102 Fig S 50HC D12 PAC Power Diagram 208 230 3 60 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 103: ...103 Fig T 50HC D14 PAC Power Diagram 208 230 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 104: ...104 Fig U 50HC D14 PAC Power Diagram 460 3 60 575 3 60 APPENDIX D WIRING DIAGRAMS ...
Страница 109: ...109 Fig Z 50HC D12 PAC Control Diagram 230 460 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 110: ...110 Fig AA 50HC D14 PAC Control Diagram 230 460 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 111: ...111 Fig AB 50HC A04 A06 PAC Power Diagram 208 230 1 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 112: ...112 Fig AC 50HC A04 A06 PAC Power Diagram 208 230 460 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 113: ...113 Fig AD 50HC A04 A06 PAC Power Diagram 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 114: ...114 Fig AE 50HC A07 PAC Power Diagram 208 230 460 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 115: ...115 Fig AF 50HC A07 PAC Power Diagram 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 116: ...116 Fig AG 50HC D08 D09 PAC Power Diagram 208 230 460 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 117: ...117 Fig AH 50HC D08 D09 PAC Power Diagram 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 118: ...118 Fig AI 50HC D11 PAC Power Diagram 208 230 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 119: ...119 Fig AJ 50HC D11 PAC Power Diagram 460 3 60 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 121: ...121 Fig AL 50HC D14 PAC Power Diagram 208 230 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 122: ...122 Fig AM 50HC D14 PAC Power Diagram 460 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 123: ...123 Fig AN 50HC D14 PAC Power Diagram 575 3 60 with Humidi MiZer System APPENDIX D WIRING DIAGRAMS ...
Страница 124: ...124 Fig AO PremierLink System A04 A06 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...
Страница 125: ...125 Fig AP RTU Open System Control A04 A06 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...
Страница 126: ...126 Fig AQ PremierLink System A07 D14 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...
Страница 127: ...127 Fig AR RTU Open A07 D14 Wiring Diagram APPENDIX D WIRING DIAGRAMS ...