![Carrier PrimeLINE 69NT40-561-200 Скачать руководство пользователя страница 157](http://html.mh-extra.com/html/carrier/primeline-69nt40-561-200/primeline-69nt40-561-200_operation-and-service-manual_2561447157.webp)
7–37
T-362
7.28 Controller Programming Procedures
This section contains programming procedures for data downloads, software loading, and configuration changes.
These are performed by using the unit display and the controller’s programming port (See
).
Videos are available that explain different programming procedures and methods for using the programming port.
The videos can be viewed from:
• Carrier Transicold’s Container Refrigeration
.
• Carrier Transicold’s ContainerLINK™ app that is available for Apple or Android devices. In ContainerLINK,
from the main menu navigate to Resources > Videos.
The following hardware solutions can be utilized with the programming port:
• MUA Adapter with USB drive (Part # 07-00571-00).
• MST Service Tool with USB drive (Part # 07-00-00572-00).
Click for instructions
• USB Adapter and USB drive**.
Click for instructions
• PCMCIA sRAM Card**
**
Device still supported but no longer available for purchase
.
CAUTION
!
The unit must be OFF whenever a programming device is inserted or removed from the
controller programming port.
7.28.1
Downloading Unit Data
1. Turn unit power off (“0”) at the Start-Stop switch (ST).
2. Inspect the pins on the controller’s programming slot for damage.
3. Insert the programming device (with proper software loaded) into the slot. See
4. Turn unit power on (“I”) at the Start-Stop switch (ST).
5. The display will show “Usb LOAd”. Use the Arrow keys to select "dnLd dAtA" and press the ENTER key.
NOTE
For PCMCIA sRAM cards, the display will open directly to the “dnLd dAtA” menu.
6. Use the Arrow keys to scroll through the download options (triP, 30 day, 60 day, 90 day, All). The amount of
available space on the USB is also displayed in this menu. Press ENTER to confirm the download choice.
7. The display will flash "dnLd" while downloading and then "dnLd donE" when complete.
8. Press the CODE SELECT key to see free space remaining.
9. Turn unit power off (“0”) at the Start-Stop switch (ST).
10. Remove the programming device from the controller. The download files can now be transferred to PC for
data evaluation with DataLINE.
11. Turn unit power on (“I”) at the Start-Stop switch (ST).
7.28.2
Loading Operational Software
PrimeLINE units must be loaded with software version 53XX. See the label in the control box door for factory
installed software version.
1. Turn unit power off (“0”) at the Start-Stop switch (ST).
2. Inspect the pins on the controller’s programming slot for damage.
3. Insert the programming device (with proper software loaded) into the slot. See
.
4. Turn unit power on (“I”) at the Start-Stop switch (ST).
5. The display will show “Usb LOAd”. Use the arrow keys to select "LOAd SoFt" and press the ENTER key.
The display will show "SEt UP"
.
Содержание PrimeLINE 69NT40-561-200
Страница 12: ......
Страница 18: ......
Страница 100: ......
Страница 182: ......
Страница 183: ...8 1 T 362 SECTION 8 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 1 LEGEND Standard Unit Configuration ...
Страница 184: ...T 362 8 2 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 2 Schematic Diagram ...
Страница 185: ...8 3 T 362 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 3 Unit Wiring Diagram Sheet 1 of 2 ...
Страница 186: ...T 362 8 4 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 4 Unit Wiring Diagram Sheet 2 of 2 ...
Страница 187: ...8 5 T 362 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 5 Legend Unit With Auto Transformer ...
Страница 188: ...T 362 8 6 ELECTRICAL WIRING SCHEMATIC AND DIAGRAMS Figure 8 6 Schematic Diagram Unit With Auto Transformer ...